Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of a contractor for the Dry Creek RM 1.8-3.8 Restoration Project, involving instream habitat and floodplain reconnection, wood enrichment, constructed margin jams, and spoil pile removal to improve Lower-Columbia Steelhead habitat.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide construction management, engineering, inspection, and materials testing services for the avenue 16 1/2 bridge replacement at dry creek project. Project includes the replacement of the existing bridge with a new pre-cast prestressed voided slab bridge with reinforced concrete deck.
Posted Date
Jan 9, 2026
Due Date
Feb 4, 2026
Release: Jan 9, 2026
Close: Feb 4, 2026
Provide construction management, engineering, inspection, and materials testing services for the avenue 16 1/2 bridge replacement at dry creek project. Project includes the replacement of the existing bridge with a new pre-cast prestressed voided slab bridge with reinforced concrete deck.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Toledo (DPU/Environmental Services) solicits bids for the Delaware Creek Stream Restoration Implementation Phase, including site clearing, stream channel realignment, bank stabilization, invasive species treatment, landscaping, seeding and planting. The project is a construction procurement (lump-sum award) funded in part by an Ohio EPA grant and a Great Lakes Restoration Initiative (GLRI) grant; bidders must meet prevailing wage and bonding requirements and submit specified city forms and bid guaranty. Bids are due January 27, 2026 at 1:30 PM EST and will be submitted electronically via the City’s PlanetBids portal.
Posted Date
Jan 9, 2026
Due Date
Jan 27, 2026
Release: Jan 9, 2026
Close: Jan 27, 2026
The City of Toledo (DPU/Environmental Services) solicits bids for the Delaware Creek Stream Restoration Implementation Phase, including site clearing, stream channel realignment, bank stabilization, invasive species treatment, landscaping, seeding and planting. The project is a construction procurement (lump-sum award) funded in part by an Ohio EPA grant and a Great Lakes Restoration Initiative (GLRI) grant; bidders must meet prevailing wage and bonding requirements and submit specified city forms and bid guaranty. Bids are due January 27, 2026 at 1:30 PM EST and will be submitted electronically via the City’s PlanetBids portal.
Available3,500 linear feet of stream restoration, including installation of in-stream structures made of rocks, wood, and soil, regrading of stream banks, and removal of soil. Including 1 LF GP-1 In-Stream Habitat Structures; 1 LS GP-3 Riprap and Bank Stabilization Structures; 1 LF GP-6 Agriculture Crossing Structures; 1 LS GP-8 Temporary Crossing Structures; 1 LS Seeding & Stabilization.
Posted Date
Jan 5, 2026
Due Date
Feb 7, 2026
Release: Jan 5, 2026
Close: Feb 7, 2026
3,500 linear feet of stream restoration, including installation of in-stream structures made of rocks, wood, and soil, regrading of stream banks, and removal of soil. Including 1 LF GP-1 In-Stream Habitat Structures; 1 LS GP-3 Riprap and Bank Stabilization Structures; 1 LF GP-6 Agriculture Crossing Structures; 1 LS GP-8 Temporary Crossing Structures; 1 LS Seeding & Stabilization.
AvailableTee, Branch 1/4" Npt X 3/8" Tube.
Posted Date
Jan 20, 2026
Due Date
Jan 28, 2026
Release: Jan 20, 2026
Close: Jan 28, 2026
Tee, Branch 1/4" Npt X 3/8" Tube.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →