Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide dredging, sediment removal, and aquatic vegetation control services for city-owned canals, stormwater retention ponds, and waterways, services will include mechanical and hydraulic dredging, shoreline restoration, sediment transport and disposal, removal of aquatic vegetation and debris, and maintenance of flow and water quality in compliance with environmental standards.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Maintenance dredging of the landing boat ramp.
Posted Date
Dec 11, 2025
Due Date
Jan 28, 2026
Release: Dec 11, 2025
Close: Jan 28, 2026
Maintenance dredging of the landing boat ramp.
AvailableHarbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
Posted Date
Oct 17, 2025
Due Date
Nov 5, 2028
Release: Oct 17, 2025
Close: Nov 5, 2028
Harbor maintenance dredging. Remove approx. 180,000 CY of accumulated sediment across the three project features.
AvailableBase work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
Posted Date
Jan 22, 2026
Due Date
Feb 6, 2026
Release: Jan 22, 2026
Close: Feb 6, 2026
Base work shall include dredging of the canal from Station 00+000 to Station 250+440. From Station 99+000 to Station 250+440 dredging will be required to a depth of 35’ MLLW (Datum) plus 1’ allowable over dredge and to a distance of 25 feet outside the channel limits where shoaling occurs along the channel edge within the authorized channel limits. Dredging will be required to a depth of 36’ MLLW (Datum) plus 1’ allowable overdepth within the contract work limits shown on the drawings from station 00+000 to station 250+440, with no side slopes delineated and/or paid for.
The project consists of maintenance dredging of the federal navigation channels in Harbor to the authorized depths which range from 20 to 30 FT below MLLW and placement of the dredged material onto beaches located 1-2 miles south of the harbor. Dredged quantities vary, but average 250,000 cubic yards of material annually. The project includes a base bid for the first dredging cycle plus three options for additional dredging cycles.
Posted Date
Jan 8, 2026
Due Date
Feb 23, 2026
Release: Jan 8, 2026
Close: Feb 23, 2026
The project consists of maintenance dredging of the federal navigation channels in Harbor to the authorized depths which range from 20 to 30 FT below MLLW and placement of the dredged material onto beaches located 1-2 miles south of the harbor. Dredged quantities vary, but average 250,000 cubic yards of material annually. The project includes a base bid for the first dredging cycle plus three options for additional dredging cycles.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis