Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Maintenance dredging of the landing boat ramp.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
PA-404 Chelmsford Boat Ramp
Posted Date
Dec 10, 2025
Due Date
Jan 13, 2026
Release: Dec 10, 2025
Close: Jan 13, 2026
PA-404 Chelmsford Boat Ramp
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
County natural resources division administers a new installation and replacement boat ramp program for boating access in county lakes. Typically, the county installs or replaces two ramps annually via this program. The boat ramp system that best suits our program contains the following: utilizes solid reinforced concrete slabs and footers designed to accommodate medium sized construction equipment over the full length of the ramp for future maintenance. The concrete slabs and footers should be designed to support boat launching and maintenance independent of existing soil conditions and erosion/scouring which is typically associated with boat power loading. The system should be adaptable to any site conditions/facility design configuration. No dewatering, coffer dams or well points should be required for installation of the system. The system must include all design/engineering to meet permitting requirements.
Posted Date
Dec 9, 2025
Due Date
Jan 14, 2026
Release: Dec 9, 2025
Close: Jan 14, 2026
County natural resources division administers a new installation and replacement boat ramp program for boating access in county lakes. Typically, the county installs or replaces two ramps annually via this program. The boat ramp system that best suits our program contains the following: utilizes solid reinforced concrete slabs and footers designed to accommodate medium sized construction equipment over the full length of the ramp for future maintenance. The concrete slabs and footers should be designed to support boat launching and maintenance independent of existing soil conditions and erosion/scouring which is typically associated with boat power loading. The system should be adaptable to any site conditions/facility design configuration. No dewatering, coffer dams or well points should be required for installation of the system. The system must include all design/engineering to meet permitting requirements.
AvailableProvide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
Posted Date
Nov 25, 2025
Due Date
Jan 6, 2026
Release: Nov 25, 2025
Close: Jan 6, 2026
Provide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
AvailableProject includes approx.51 SY if 95 % compaction earthen fill ; 51 SY of 5" OF compacted type 1 granular base ; 1 LS of mobilization ; 1 LS of removal of improvements ; 11 TONS of 4" bituminous base ; 16.3 CY of concrete boat ramp ; 1 LS of traffic control; 5.5 TONS of 2" asphaltic concrete surface course.
Posted Date
Dec 11, 2025
Due Date
Jan 29, 2026
Release: Dec 11, 2025
Close: Jan 29, 2026
Project includes approx.51 SY if 95 % compaction earthen fill ; 51 SY of 5" OF compacted type 1 granular base ; 1 LS of mobilization ; 1 LS of removal of improvements ; 11 TONS of 4" bituminous base ; 16.3 CY of concrete boat ramp ; 1 LS of traffic control; 5.5 TONS of 2" asphaltic concrete surface course.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →