Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Putnam County
Provide the civil work required for the new boat ramp and parking, construction of a gravel parking lot, concrete walkways / sidewalks, new double concrete boat ramp, docks, aluminum gangways, floating docks, and asphalt aprons connected to existing roadway, etc on approx 2.88 acres.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Cherokee Nation
The Cherokee Nation Cultural and Economic Development (CED) is soliciting sealed proposals from qualified contractors for construction of a new boat ramp at Sallisaw Creek as part of the Cherokee Nation Park Project. Work includes site preparation, earthwork, concrete construction, shoreline and access improvements, erosion and sediment control, and site restoration; the project duration is 90 calendar days.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Cherokee Nation
Close: Dec 12, 2025
The Cherokee Nation Cultural and Economic Development (CED) is soliciting sealed proposals from qualified contractors for construction of a new boat ramp at Sallisaw Creek as part of the Cherokee Nation Park Project. Work includes site preparation, earthwork, concrete construction, shoreline and access improvements, erosion and sediment control, and site restoration; the project duration is 90 calendar days.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Cherokee Nation
1. Site preparation. perform detailed site assessment and layout verification. mobilize personnel, equipment, and materials to the project site 2. Earthwork. conduct excavation, grading, and subgrade preparation per design elevations 3. Concrete construction. install formwork and reinforcement. place and finish reinforced concrete for the boat ramp structure 4. Shoreline and access improvements. construct pedestrian and vehicle access pathways. provide shoreline stabilization (e. G. , riprap placement or equivalent measures) 5. Erosion and sediment control. implement and maintain best management practices (bmps) throughout construction 6. Site restoration. perform final grading, site cleanup, and restoration to preconstruction condition or better.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Cherokee Nation
Close: Dec 12, 2025
1. Site preparation. perform detailed site assessment and layout verification. mobilize personnel, equipment, and materials to the project site 2. Earthwork. conduct excavation, grading, and subgrade preparation per design elevations 3. Concrete construction. install formwork and reinforcement. place and finish reinforced concrete for the boat ramp structure 4. Shoreline and access improvements. construct pedestrian and vehicle access pathways. provide shoreline stabilization (e. G. , riprap placement or equivalent measures) 5. Erosion and sediment control. implement and maintain best management practices (bmps) throughout construction 6. Site restoration. perform final grading, site cleanup, and restoration to preconstruction condition or better.
AvailableTown of Bourne
The Town of Bourne is soliciting bids for the Hen Cove Boat Ramp Reconstruction Project to improve the parking area and storm drainage, with work in accordance with the bid specifications. A non‑mandatory pre‑bid meeting is scheduled, and bids are due December 18, 2025 at 4:00 PM.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Town of Bourne
Close: Dec 18, 2025
The Town of Bourne is soliciting bids for the Hen Cove Boat Ramp Reconstruction Project to improve the parking area and storm drainage, with work in accordance with the bid specifications. A non‑mandatory pre‑bid meeting is scheduled, and bids are due December 18, 2025 at 4:00 PM.
AvailableTown of Bourne
The Town of Bourne is soliciting bids for the Hen Cove Boat Ramp Reconstruction Project to improve the parking area and storm drainage, with work in accordance with the bid specifications. A non‑mandatory pre‑bid meeting is scheduled, and bids are due December 18, 2025 at 4:00 PM.
Posted Date
Nov 20, 2025
Due Date
Dec 18, 2025
Release: Nov 20, 2025
Town of Bourne
Close: Dec 18, 2025
The Town of Bourne is soliciting bids for the Hen Cove Boat Ramp Reconstruction Project to improve the parking area and storm drainage, with work in accordance with the bid specifications. A non‑mandatory pre‑bid meeting is scheduled, and bids are due December 18, 2025 at 4:00 PM.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →