Missouri Department of Transportation
State AgencyMO
Jul 20, 2026
Closes
Aug 21, 2026
Tree Clearing RFP
Tree clearing.
Description: The clearing operation will consist of removing and disposing of trees and overgrown shrubs within the 1,800 SF shown on plans. Stumps shall be cut flush as low as possible to the ground, no higher than 6 inches above the surrounding grade.
City · CT, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Missouri Department of Transportation
State AgencyMO
Jul 20, 2026
Closes
Aug 21, 2026
Tree clearing.
CityWI
Aug 6, 2026
Closes
Aug 10, 2026
Work to be completed is complete pulverization of the existing road with the addition of 4" of gravel for 8,078 FT.
CityWI
Aug 6, 2026
Closes
Aug 13, 2026
Work to be completed is: Project 1: Complete pulverization of the existing road with the addition of 4" of gravel. Project 2: Lay 3" (compacted) X 20' of hot mix asphalt with a 2.6' gravel shoulders for 10,296 FT.
CityAR
-
Closes
Aug 28, 2026
Purchase and delivery of trees, watering bags, planting soil, root fertilizer and mulch.
Procurement and program contacts connected to Town of East Lyme.