CityIN
Aug 14, 2026
Closes
Sep 8, 2026
Marion Street Trail RFP
Work includes construction of approx 0.1 mile of a multi-use trail along the south side of marion street.
Description: Construction of a multi-use trail on Douro Street, including excavation, granular material placement, asphalt trail construction, drainage improvements, grading, and repairs to driveway entrances and curbs.
City · ON, CA
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityIN
Aug 14, 2026
Closes
Sep 8, 2026
Work includes construction of approx 0.1 mile of a multi-use trail along the south side of marion street.
Virginia Department of Transportation
State AgencyVA
Aug 11, 2026
Closes
Sep 23, 2026
This Invitation for Bids covers construction of the B05_2026 Scenic Trail from 2.20 miles of Intersection Route 674 to the 0.00-mile Rocky Mount line in Franklin County, Virginia. The solicitation requires contractor prequalification, and all questions must be submitted to VDOT using the Contractors Advertisement Bulletin Board. The opportunity was issued on August 11, 2026, and bids are due September 23, 2026, at 10:00 AM Eastern Time.
CityNC
Aug 11, 2026
Closes
Sep 3, 2026
The Town of Clayton's posting requests sealed bids for the 2026 Street Rehabilitation Project. It is a Construction (Civil) solicitation, and the full advertisement, construction drawings, bidding documents, and contract manual are available after bidders register as plan holders. The posting states that the advertisement and related documents are non-transferable.
CityMO
Aug 11, 2026
Closes
Sep 9, 2026
Proposed work includes: The construction of asphaltic pavement overlay on various residential streets which includes but is not limited to traffic control and any incidental work at various street locations as described in the specifications.
Decision makers connected to this RFP from Stratford (City).