CityCO
Posted
Sep 1, 2026
Sep 23, 2026
Construction of Wildhorse Trail (Westside Trail) RFP
Project will consist of a multi-use trail including grading and drainage, ADA compliant access points, and integration with existing infrastructure.
Description: Construction of a multi-use trail on Douro Street, including excavation, granular material placement, asphalt trail construction, drainage improvements, grading, and repairs to driveway entrances and curbs.
City · ON, CA
Original attachments and procurement documents tied to this bid.
These related opportunities are still open for bidding.
CityCO
Posted
Sep 1, 2026
Sep 23, 2026
Project will consist of a multi-use trail including grading and drainage, ADA compliant access points, and integration with existing infrastructure.
CityLA
Posted
Aug 19, 2026
Sep 17, 2026
Provide street improvements.
CityUT
Posted
Sep 2, 2026
Sep 22, 2026
Works include approx 1,142 CY of excavation; 667 TN of 1/2" HMA; 6,500 LF of 4" paint stripping.
CityCA
Posted
Aug 17, 2026
Sep 18, 2026
The City of Carlsbad is seeking a qualified contractor to resurface approximately 50 miles of city streets using Type 1 slurry seal, Type 2 slurry seal, or asphalt concrete overlay. The work also includes roadway restriping, thermoplastic symbols and legends, minor concrete work, and provision of all required labor, equipment, materials, permits, utilities, and traffic-control services. This is an electronic Invitation for Bid with a $15,239,000 estimated value, a 170-working-day duration, and required bid, payment, and performance bonds.
Decision makers connected to this RFP from Stratford (City).