CountyTN
Posted
Aug 14, 2026
Sep 15, 2026
McDonald Farm Water Upgrades
This project includes the installation of approx. 2,650 LF of 2" diameter Class 200 PVC pipe water line and several multi-valve box stations within the McDonald Farm Park Property. The water line will connect to the existing water meter installed on the west side of the existing driveway entrance.