Domestic Water Boiler Replacement At Baton Rouge Metro Airport RFP
Supply and replace 1 EA of four domestic water boilers. Furnish, install, and connect a temporary portable boiler system to maintain uninterrupted hot water service throughout the duration of the boiler replacement work. Operate and monitor the temporary boiler system until permanent boilers are fully installed and functional. Remove the temporary system upon completion. Remove the existing four (4) domestic boilers located in the mechanical room. Remove any existing piping, valves, supports, or components as necessary to facilitate boiler removal. Dispose of removed equipment and materials in accordance with local and state regulations.