Summary
Electrical upgrades for Dock 3 include: Demolish existing pedestals from floating docks, demolish existing power cables from existing panels to all pedestals, demolish existing panel and service feeder, provide new electrical service Panel 3 and associated metering equipment, coordinate with Brandy Gwynn of Central Lincoln PUD for all utility work, provide all required raceways, conductors, cables and means of support, install new pedestals to be furnished by the port, provide emergency disconnects (IAW NEC 555.36, and provide new permanent safety signs IAW NEC 555.10. Dock 5 work includes demolish existing pedestals from floating docks, demolish existing power cables from existing panel to all pedestals, demolish existing panel and service feeder, provide new electrical service Panels 5A and 5B and associated metering equipment, coordinate with Brandy Gwynn of Central Lincoln PUD for all utility work, provide all required raceways, conductors, cables and means of support, install new pedestals to be furnished by the port, provide a new service feeder and disconnect to existing fuel dock mounted on support means approved by the harbormaster, provide emergency disconnects IAW NEC 555.36 and permanent safety signs IAW ENC 555.10. The contractor is responsible for subgrade construction on city sidewalks. Contractor will make cuts and patches to concrete. Provide new grounding electrical systems, and timely and legally dispose of all materials removed as part of this project. Salvage spare parts from demolished pedestals before final disposal.