CityCT
Aug 17, 2026
Closes
Aug 17, 2026
CT Farm Yogurt RFP
Supply of yogurt in the form of cups and tubs in various flavors that must be from farms/dairies.
Description: Temporary agricultural use of the farm.
City · NJ, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to Township of Marlboro.
Adjacent opportunities open for bidding right now.
CityCT
Aug 17, 2026
Closes
Aug 17, 2026
Supply of yogurt in the form of cups and tubs in various flavors that must be from farms/dairies.
CountyWI
Jun 10, 2026
Closes
Aug 7, 2026
Proposals for the development of county-owned land known as the county farm. This 115-acre site offers a unique opportunity to create a mixed-use, mixed-density neighborhood that meets current and future housing needs while enhancing west salem's character. Soliciting development teams’ initial interest in the use and development of County-owned land through public-private partnership. The project will leverage County assets and resources to develop a mixed-use residential development.
South Carolina Department of Corrections
School DistrictSC
Jul 20, 2026
Closes
Aug 6, 2026
Farm Equipment Lease - Qty 3 - New 2026 JD 6130M Cab Tractor FT4 with 620MSL Loader (or equivalent).
Knoxville Metropolitan Airport Authority
Special DistrictTN
Jul 10, 2026
Closes
Aug 13, 2026
Construction of: base bid: new fuel farm additive alternate no. 1: electrical lighting for charlie ramp additive alternate no. 2: blast deflection system additive alternate no. 3: stainless steel fuel farm piping at mcghee tyson airport (tys). Base Bid Scope Of Work: 1. Buildings 2. fuel farm systems, 3. electrical systems 4. mechanical systems 5. fire alarm systems 6. landscape 7. IT, communications systems, and security systems (access control and surveillance) 8. wayfinding and signage 9. erosion and sediment control measures 10. fencing and gates 11. building pavements 12. Other Miscellaneous Items ADDITIVE ALTERNATE NO. 1: ELECTRICAL LIGHTING FOR CHARLIE RAMP The Work shall include but not limited to: - design of the final lighting system with light pole foundations, - erosion and sediment control measures, - construction safety and phasing measures, - temporary facilities, - earthwork installation of mast electrical lighting system (foundation, masts and lighting fixtures), - surveillance systems, IT and communications systems - site reclamation. ADDITIVE ALTERNATE NO. 2: BLAST DEFLECTION SYSTEM 1. The Work shall include but not limited to: - design of blast deflection system - erosion and sediment control measures, - construction safety and phasing measures, - temporary facilities, - earthwork, - installation of blast defection system - site reclamation ADDITIVE ALTERNATE NO. 3: STAINLESS STEEL FUEL FARM PIPING AND FITTINGS 1. Provide stainless steel piping, fittings, and general valves (ball valves, check valves, etc.) in place of coated carbon steel piping, fittings, and valves.