Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Diamond grinding concrete pavement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Maintenance and rehabilitation of airfield and landside pavements to ensure safety, regulatory compliance, and operational efficiency. Asphalt and concrete surfaces at these facilities are subject to heavy use, weathering, and occasional emergency repairs, necessitating access to specialized grinding and pavement equipment on an as-needed basis.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Maintenance and rehabilitation of airfield and landside pavements to ensure safety, regulatory compliance, and operational efficiency. Asphalt and concrete surfaces at these facilities are subject to heavy use, weathering, and occasional emergency repairs, necessitating access to specialized grinding and pavement equipment on an as-needed basis.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Maintenance and rehabilitation of airfield and landside pavements to ensure safety, regulatory compliance, and operational efficiency. Asphalt and concrete surfaces at these facilities are subject to heavy use, weathering, and occasional emergency repairs, necessitating access to specialized grinding and pavement equipment on an as-needed basis.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Maintenance and rehabilitation of airfield and landside pavements to ensure safety, regulatory compliance, and operational efficiency. Asphalt and concrete surfaces at these facilities are subject to heavy use, weathering, and occasional emergency repairs, necessitating access to specialized grinding and pavement equipment on an as-needed basis.
AvailableWork includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
AvailableThe general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
Posted Date
Oct 17, 2025
Due Date
Jan 13, 2026
Release: Oct 17, 2025
Close: Jan 13, 2026
The general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.