Retrieving RFP details
Release
Close
Sunline Transit Agency
The general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
PlanetBids Vendor Portal
Wisconsin Department of Transportation
Removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration. See attached file and outside link.
Wisconsin Department of Transportation
Removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, lighting, traffic signals, restoration. See attached file and outside link.
Wisconsin Department of Transportation
Removals, milling, grading, aggregate, concrete pavement, asphalt pavement, structure rehabilitation, curb and gutter, concrete sidewalk, beam guard, erosion control, traffic control, pavement marking. See attached file and outside link.
Release
Oct 17, 2025
Close
Jan 13, 2026