Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The work consist of approx 530 CY common excavation; 92 SY 8" concrete pavement; 18,679 LF centerline asphaltic rumble strips; 487.5 LF MGS guardrail 3; 381 LF silt fence; 626 LF sawing asphalt; 324 LF sawing concrete.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Posted Date
Dec 9, 2025
Due Date
Jan 13, 2026
Release: Dec 9, 2025
Close: Jan 13, 2026
Work includes removals, grading, aggregate, concrete pavement, asphalt pavement, curb and gutter, concrete sidewalk, storm sewer, erosion control, permanent signing, traffic control, pavement marking, sanitary, water, restoration.
Premium
Access the largest public sector contact database
Work includes 6 EA removing small pipe culverts; 100 SY removing concrete pavement; 715 SY removing asphaltic surface; 140 SY removing asphaltic surface butt joints; 134,000 SY removing asphaltic surface milling; 1,332 LF removing curb & gutter; 1,377 CY excavation common; 1 EA prepare foundation for asphaltic paving; 722 STA prepare foundation for asphaltic shoulders; 2,485 TN base aggregate dense 3/4-inch. See attached file.
Posted Date
Nov 4, 2025
Due Date
Jan 13, 2026
Release: Nov 4, 2025
Close: Jan 13, 2026
Work includes 6 EA removing small pipe culverts; 100 SY removing concrete pavement; 715 SY removing asphaltic surface; 140 SY removing asphaltic surface butt joints; 134,000 SY removing asphaltic surface milling; 1,332 LF removing curb & gutter; 1,377 CY excavation common; 1 EA prepare foundation for asphaltic paving; 722 STA prepare foundation for asphaltic shoulders; 2,485 TN base aggregate dense 3/4-inch. See attached file.
AvailableSaline County is soliciting competitive bids for 2026 hot-mix asphalt pavement work, milling, and aggregate shoulder construction. The project scope includes HMA pavement placement, milling operations, and aggregate shouldering per the bid specifications; completion is expected in 2026. Bids are due December 30, 2025, with an 11:00 AM Central bid opening; the solicitation is an Invitation for Bid and not a grant.
Posted Date
Nov 26, 2025
Due Date
Dec 30, 2025
Release: Nov 26, 2025
Close: Dec 30, 2025
Saline County is soliciting competitive bids for 2026 hot-mix asphalt pavement work, milling, and aggregate shoulder construction. The project scope includes HMA pavement placement, milling operations, and aggregate shouldering per the bid specifications; completion is expected in 2026. Bids are due December 30, 2025, with an 11:00 AM Central bid opening; the solicitation is an Invitation for Bid and not a grant.
AvailableThe general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
Posted Date
Oct 17, 2025
Due Date
Jan 13, 2026
Release: Oct 17, 2025
Close: Jan 13, 2026
The general scope of work for this Project is to replace existing asphalt concrete and concrete pavement, adjust utility frames and covers. The proposed work includes but is not limited to the following: removal of asphalt concrete and reinforced concrete pavement; adjustment of utility covers (clean out, manhole, water valve, pull box, etc.) to grade including removal of existing concrete collars and placement of concrete collars around all appurtenances; placement of asphalt concrete and high early concrete pavements; salvage, furnish and install precast concrete wheel stops; furnish and install pressure treated header and cobble; paint parking stall lines (both bus and passenger vehicle), gore area, pavement arrows, stop lines, pavement messages, and bus stall numbers; provide subgrade correction for two areas; and other ancillary construction activities noted in the plans.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis