Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the existing MCC with a new, fully functional system Ensure minimal disruption and downtime to ongoing operations during installation.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes: Demolish and remove existing generator; fuel tank; fuel lines; full removal of existing wet well along with existing pumps; piping; electrical; install 8' concrete wet well with pumps, piping, and fittings; install concrete meter vault with an internal bypass connection; install owner-furnished generator with concrete pad; improve existing electrical, instrumentation, and control systems; and site grading and pavement includes 2 EA cap and fill pipes to be abandoned, 1 CY control density fill (CDF), 56 LF 1" copper pipe and fittings & connect to existing 1" water system, 25 LF 8" class 52 ductile iron gravity sewer & force main, 1 EA connection to existing SSMH and existing force main, 1 LS wet well coating and preparation.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes: Demolish and remove existing generator; fuel tank; fuel lines; full removal of existing wet well along with existing pumps; piping; electrical; install 8' concrete wet well with pumps, piping, and fittings; install concrete meter vault with an internal bypass connection; install owner-furnished generator with concrete pad; improve existing electrical, instrumentation, and control systems; and site grading and pavement includes 2 EA cap and fill pipes to be abandoned, 1 CY control density fill (CDF), 56 LF 1" copper pipe and fittings & connect to existing 1" water system, 25 LF 8" class 52 ductile iron gravity sewer & force main, 1 EA connection to existing SSMH and existing force main, 1 LS wet well coating and preparation.
AvailableThe work under this project includes the following: replacement of existing packaged pump station, installation of flowmetering vault, replacement of approximately 45 linear feet of sanitary sewer forcemain, including associated appurtenances, and restoration. The project also includes sanitary sewer rehabilitation including cured in place pipe lining, and manhole lining and all else necessary to furnish a complete project as shown and specified in the contract documents
Posted Date
Nov 26, 2025
Due Date
Jan 14, 2026
Release: Nov 26, 2025
Close: Jan 14, 2026
The work under this project includes the following: replacement of existing packaged pump station, installation of flowmetering vault, replacement of approximately 45 linear feet of sanitary sewer forcemain, including associated appurtenances, and restoration. The project also includes sanitary sewer rehabilitation including cured in place pipe lining, and manhole lining and all else necessary to furnish a complete project as shown and specified in the contract documents
AvailableThe City of Friendswood seeks sealed bids for the rehabilitation of sanitary sewer Lift Station No. 4 under its 2020 Lift Station Mitigation program. Bids are due January 7, 2026 at 2:00 PM CST, with a pre‑bid meeting on December 8, 2025 at 10:00 AM.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
The City of Friendswood seeks sealed bids for the rehabilitation of sanitary sewer Lift Station No. 4 under its 2020 Lift Station Mitigation program. Bids are due January 7, 2026 at 2:00 PM CST, with a pre‑bid meeting on December 8, 2025 at 10:00 AM.
AvailableWork includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Posted Date
Nov 7, 2025
Due Date
Jan 7, 2026
Release: Nov 7, 2025
Close: Jan 7, 2026
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.