Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Lake Stevens Sewer District's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Human Resources Manager
Executive Administrative Assistant
General Manager
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Lake Stevens Sewer District
Work includes: Demolish and remove existing generator; fuel tank; fuel lines; full removal of existing wet well along with existing pumps; piping; electrical; install 8' concrete wet well with pumps, piping, and fittings; install concrete meter vault with an internal bypass connection; install owner-furnished generator with concrete pad; improve existing electrical, instrumentation, and control systems; and site grading and pavement includes 2 EA cap and fill pipes to be abandoned, 1 CY control density fill (CDF), 56 LF 1" copper pipe and fittings & connect to existing 1" water system, 25 LF 8" class 52 ductile iron gravity sewer & force main, 1 EA connection to existing SSMH and existing force main, 1 LS wet well coating and preparation.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
Lake Stevens Sewer District
Close: Jan 6, 2026
Work includes: Demolish and remove existing generator; fuel tank; fuel lines; full removal of existing wet well along with existing pumps; piping; electrical; install 8' concrete wet well with pumps, piping, and fittings; install concrete meter vault with an internal bypass connection; install owner-furnished generator with concrete pad; improve existing electrical, instrumentation, and control systems; and site grading and pavement includes 2 EA cap and fill pipes to be abandoned, 1 CY control density fill (CDF), 56 LF 1" copper pipe and fittings & connect to existing 1" water system, 25 LF 8" class 52 ductile iron gravity sewer & force main, 1 EA connection to existing SSMH and existing force main, 1 LS wet well coating and preparation.
AvailableLake Stevens Sewer District
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
Posted Date
Oct 14, 2025
Due Date
Nov 6, 2025
Release: Oct 14, 2025
Lake Stevens Sewer District
Close: Nov 6, 2025
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
Lake Stevens Sewer District
Services for the demolition and removal of the existing concrete meter vault and wet well structures, demolition of all concrete pads, the removal of 20 plus trees, one of which is to remain, the removal of an existing retaining wall (<2.5 feet), removal of the existing chain-link fence, and site restoration by means of import fill.
Posted Date
Oct 7, 2025
Due Date
Oct 28, 2025
Release: Oct 7, 2025
Lake Stevens Sewer District
Close: Oct 28, 2025
Services for the demolition and removal of the existing concrete meter vault and wet well structures, demolition of all concrete pads, the removal of 20 plus trees, one of which is to remain, the removal of an existing retaining wall (<2.5 feet), removal of the existing chain-link fence, and site restoration by means of import fill.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.