Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of a new lift station and demolition/abandonment of the existing lift station. Maintaining operations of all systems during construction. Installation of new gravity system and other work.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Posted Date
Jan 4, 2026
Due Date
Feb 5, 2026
Release: Jan 4, 2026
Close: Feb 5, 2026
2 EA of Pumps, Lift Station-60P; Parts Lift Station-60P; Spare Parts, Lift Station-60P; Startup Services, Lift Station-60P; Control Panel, Lift Station -60P. 2 EA of Pumps, Lift Station-62P; Parts Lift Station-62P; Spare Parts, Lift Station-62P; Startup Services, Lift Station-62P; Control Panel, Lift Station -62P.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Project involves the replacement of an existing small wastewater lift station. Demolition of existing lift station, including removing existing lift station, removing pavements, removing existing equipment and piping, complete in place; Package Lift Station, includes Pumps, Piping, Fittings, Guide Rails, Lift Chains, Vent, Hatches, Valves, Valve Pit, Electrical Equipment Installation including, but not limited to: lift station control panel, terminal boxes, main breaker, manual transfer switch, conduit, wire, and all ancillary devices; 10 LF Proposed 2" PVC SCHED 40 Sanitary Sewer Force Main;
AvailableConstruction of the Bonds Ranch Lift Station A wet well, site layout, electrical building, backup generator, submersible pumps, motors, discharge piping & appurtenances, and approximately 225 LF of 16-inch force main.
Posted Date
Dec 10, 2025
Due Date
Jan 15, 2026
Release: Dec 10, 2025
Close: Jan 15, 2026
Construction of the Bonds Ranch Lift Station A wet well, site layout, electrical building, backup generator, submersible pumps, motors, discharge piping & appurtenances, and approximately 225 LF of 16-inch force main.
AvailableConvert an existing wet pit/dry pit sewage lift station to a submersible lift station by removing all the block and frame construction, and a portion of the cast-in-place concrete construction; removing all equipment and material from within the generator room; the hvac equipment room; all piping material/equipment from within the dry pit pump area; all electrical equipment from within the electrical room; installing owner-supplied new submersible pumps in the wet well; site improvements and restoration.
Posted Date
Nov 9, 2025
Due Date
Jan 14, 2026
Release: Nov 9, 2025
Close: Jan 14, 2026
Convert an existing wet pit/dry pit sewage lift station to a submersible lift station by removing all the block and frame construction, and a portion of the cast-in-place concrete construction; removing all equipment and material from within the generator room; the hvac equipment room; all piping material/equipment from within the dry pit pump area; all electrical equipment from within the electrical room; installing owner-supplied new submersible pumps in the wet well; site improvements and restoration.