Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
716 CY muck excavation - mgmt. Level 1 - offsite disposal; 185 CY muck excavation - mgmt. Level 2 - landfill disposal; 509 CY common excavation (offsite); 1 ea construct 48" dia. outlet control structure; 1 ea construct 72" dia. catch basin w/ 4' sum. Together with traffic control, removals, dewatering, seeding, erosion control, and other related appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Grand Rapids Department of Engineering is soliciting bids for the reconstruction of Oxford Street between Norwich Avenue and Godfrey Avenue. The project consists of roadway improvements as specified in the bid documents available through Bid Express. Bids are due to the City via the Bid Express portal by the stated deadline.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
The City of Grand Rapids Department of Engineering is soliciting bids for the reconstruction of Oxford Street between Norwich Avenue and Godfrey Avenue. The project consists of roadway improvements as specified in the bid documents available through Bid Express. Bids are due to the City via the Bid Express portal by the stated deadline.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of pond maintenance services, including all labor, equipment, and materials, for the City of Waukee.
Posted Date
-
Due Date
Feb 4, 2026
Release: -
Close: Feb 4, 2026
Procurement of pond maintenance services, including all labor, equipment, and materials, for the City of Waukee.
AvailablePond maintenance for 5 Village ponds. Contract period beginning approx. April 1st, 2026 up to November 1st, 2026. Contract may be extended for not more than two (2) additional periods under the same terms and conditions.
Posted Date
Jan 2, 2026
Due Date
Feb 6, 2026
Release: Jan 2, 2026
Close: Feb 6, 2026
Pond maintenance for 5 Village ponds. Contract period beginning approx. April 1st, 2026 up to November 1st, 2026. Contract may be extended for not more than two (2) additional periods under the same terms and conditions.
AvailableMnDOT is procuring a design‑build team to reconstruct University Avenue and Fourth Street in Minneapolis near I‑135W to improve pedestrian and bicyclist safety and corridor infrastructure. The project includes protected intersections, ADA improvements, separated bike facilities, roadway and sidewalk reconstruction, replacement of bridges over I‑135W, and associated signal and drainage work. The procurement schedule lists the RFP release on January 7 2026 and a letting in April 2026, with construction beginning in 2026.
Posted Date
Jan 7, 2026
Due Date
Apr 15, 2026
Release: Jan 7, 2026
Close: Apr 15, 2026
MnDOT is procuring a design‑build team to reconstruct University Avenue and Fourth Street in Minneapolis near I‑135W to improve pedestrian and bicyclist safety and corridor infrastructure. The project includes protected intersections, ADA improvements, separated bike facilities, roadway and sidewalk reconstruction, replacement of bridges over I‑135W, and associated signal and drainage work. The procurement schedule lists the RFP release on January 7 2026 and a letting in April 2026, with construction beginning in 2026.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →