Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Modernize the main campus central plant, including replacing one boiler, two chillers, one cooling tower, pumps, piping, lighting, electrical, controls, and all related work. Replace the avon williams campus chiller, cooling tower, pumps, and related work. The project will be phased to accommodate heating and cooling seasons.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
Posted Date
Nov 24, 2025
Due Date
Jan 28, 2026
Release: Nov 24, 2025
Close: Jan 28, 2026
DESIGN-BUILD - acquisition for modernization and expansion of central utility plant. Design of the steam plant. The design shall encompass all necessary building systems, including structural, HVAC, plumbing, fire/life safety, controls, and related components required to support the steam plant modernization. This scope also includes, as an enhancement, the replacement of underground diesel fuel tanks and associated piping. Such replacement may be executed as either aboveground or underground and shall be integrated with the overall project design.
AvailableWork includes the replacement of the existing base-mounted primary and standby glycol hot water pumps and piping specialties with new base-mounted pumps with VFD's and piping specialties. Conversion of the existing open hot water expansion tank system to a closed hot water expansion tank system in each boiler plant. Providing a new glycol boiler feed pump and tank system. Upgrade the controls of the hot water pumps, boilers and associated equipment in each boiler plant, with new Siemens controls that will be interfaced with the existing campus ems.
Posted Date
Jan 12, 2026
Due Date
Feb 9, 2026
Release: Jan 12, 2026
Close: Feb 9, 2026
Work includes the replacement of the existing base-mounted primary and standby glycol hot water pumps and piping specialties with new base-mounted pumps with VFD's and piping specialties. Conversion of the existing open hot water expansion tank system to a closed hot water expansion tank system in each boiler plant. Providing a new glycol boiler feed pump and tank system. Upgrade the controls of the hot water pumps, boilers and associated equipment in each boiler plant, with new Siemens controls that will be interfaced with the existing campus ems.
AvailableThis project will construct upgrades to the solids handling and solids treatment processes at the existing city of sumner wastewater treatment plant. These improvements will include construct an expansion to the existing solids handling building including: install new indirect biosolids dryer; thermal fluid heaters; and all equipment. Construct temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures, and processes will include: replace the existing thickened primary sludge pumps in existing scum pump building, demolition of existing dissolved air floatation thickener, and associated equipment in equipment building 2 and the installation of new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of existing thickening and dewatering polymer systems and replacement of existing air gap system in the existing solids handling building. Reconfigure dewatered sludge conveyance system including rehabilitation of existing dewatered sludge storage hopper, modifications to existing conveyors (temporary and permanent) and installation of new conveyors. Demolish existing waste gas burner and installation of new digester gas treatment system to include hydrogen sulfide and moisture removal and digester gas compression, as well as installation of a new enclosed waste gas flare. Replace existing submersible pumps in plant drain pump station no. 1 and walls of existing centrate storage tank will be raised 6'. Replace internal recycle pumps and anoxic zone mixers in aeration basins 1 and 2. Install new and modify existing electrical power distribution and control equipment to support the new improvements, including installation of new standby generator with subbase fuel tank in a sound attenuating enclosure. Construct new hammerhead on state street just outside entrance to the plant and new security fencing and access gates. Bid additive no. 1 will include the replacement of existing effluent UV disinfection system.
Posted Date
Oct 8, 2025
Due Date
Feb 24, 2026
Release: Oct 8, 2025
Close: Feb 24, 2026
This project will construct upgrades to the solids handling and solids treatment processes at the existing city of sumner wastewater treatment plant. These improvements will include construct an expansion to the existing solids handling building including: install new indirect biosolids dryer; thermal fluid heaters; and all equipment. Construct temporary haul truck loading bay to facilitate demolition of existing facilities. Modifications to existing treatment systems, structures, and processes will include: replace the existing thickened primary sludge pumps in existing scum pump building, demolition of existing dissolved air floatation thickener, and associated equipment in equipment building 2 and the installation of new rotary drum thickener and associated thickened waste activated sludge pumps, replacement of existing thickening and dewatering polymer systems and replacement of existing air gap system in the existing solids handling building. Reconfigure dewatered sludge conveyance system including rehabilitation of existing dewatered sludge storage hopper, modifications to existing conveyors (temporary and permanent) and installation of new conveyors. Demolish existing waste gas burner and installation of new digester gas treatment system to include hydrogen sulfide and moisture removal and digester gas compression, as well as installation of a new enclosed waste gas flare. Replace existing submersible pumps in plant drain pump station no. 1 and walls of existing centrate storage tank will be raised 6'. Replace internal recycle pumps and anoxic zone mixers in aeration basins 1 and 2. Install new and modify existing electrical power distribution and control equipment to support the new improvements, including installation of new standby generator with subbase fuel tank in a sound attenuating enclosure. Construct new hammerhead on state street just outside entrance to the plant and new security fencing and access gates. Bid additive no. 1 will include the replacement of existing effluent UV disinfection system.
AvailableInspection, maintenance and repair of all equipment in the Central Utilities Plant (CUP).
Posted Date
Dec 4, 2025
Due Date
Jan 30, 2026
Release: Dec 4, 2025
Close: Jan 30, 2026
Inspection, maintenance and repair of all equipment in the Central Utilities Plant (CUP).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →