Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
Integrated Postsecondary Education Data System identifier.
University or college mascot.
Full-time equivalent employees.
Graduation rate percentage.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: If sale is less than $50,000, use sole source.
Coops: If reseller path isn’t available, pivot to an available cooperative contract and confirm access with PCPS.
West Virginia University (WVU).
Viability: High-risk and opaque; little public evidence of awards.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across West Virginia University's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Program Director of Employer Relations, Career Services
Director of BSN Program
Associate Vice President of Talent and Culture
Strategic HR Partner
Premium
Access the largest public sector contact database
Track vendor wins and renewal opportunities
West Virginia University
This document outlines the renewal of an existing 'Digital Measures Enterprise Subscription' contract (U20DIGITAL) between West Virginia University and Watermark Insights, LLC. The original contract, effective October 16, 2019, covered services from January 1, 2020, to December 31, 2022. The current change request, dated October 25, 2022, renews this open-end contract for an additional three-year term, from January 1, 2023, to December 31, 2025, with specified annual subscription fees for each year of the renewal period. The agreement includes the original Organization Subscription Agreement, a Quote and Order Form for the renewal, and a West Virginia State Addendum modifying standard contractual terms.
Effective Date
Jan 1, 2020
Expires
Effective: Jan 1, 2020
West Virginia University
Expires:
This document outlines the renewal of an existing 'Digital Measures Enterprise Subscription' contract (U20DIGITAL) between West Virginia University and Watermark Insights, LLC. The original contract, effective October 16, 2019, covered services from January 1, 2020, to December 31, 2022. The current change request, dated October 25, 2022, renews this open-end contract for an additional three-year term, from January 1, 2023, to December 31, 2025, with specified annual subscription fees for each year of the renewal period. The agreement includes the original Organization Subscription Agreement, a Quote and Order Form for the renewal, and a West Virginia State Addendum modifying standard contractual terms.
See expiring contracts, renewal risk, pricing history, and competitor awards — then sync the data to your CRM.
Active opportunities open for bidding
West Virginia University
Provide delegated design/installation services from a qualified electrical contractor for the replacement and upgrade of the indoor lighting. The complete replacement of the lighting system above the playing surface to achieve an average illumination of 75fc across the entire surface.
Posted Date
Jan 22, 2026
Due Date
Feb 9, 2026
Release: Jan 22, 2026
West Virginia University
Close: Feb 9, 2026
Provide delegated design/installation services from a qualified electrical contractor for the replacement and upgrade of the indoor lighting. The complete replacement of the lighting system above the playing surface to achieve an average illumination of 75fc across the entire surface.
AvailableWest Virginia University
Provide the material, equipment, tools and labor necessary for the rehabilitation of the Towers PRT Station. Remove the existing roof, insulation, and wood deck down to the structural steel; remove loose membrane flashings; remove all debris from the roof and haul away to an approved landfill. Provide and install new 22-Gauge Galvanized B-Deck. Painting of the deck shall not be part of this project. Remove the existing lightning protection system. The installation of a new lightning protection system shall not be part of this project. Provide and install new wood blocking at the roof edge to the height of the new tapered insulation. Frame in the existing windows on the raised roof area with steel framing and plywood sheathing. Insulate the back side of the framed wall to prevent condensation. Flash the new wall with EPDM flashing. Apply a continuous layer of tapered insulation with a minimum thickness of 1.5” at the roof drain over the entire area Apply a 60 mil, fully adhered, EPDM rubber roof system over the new insulation At all walls and curbs, install membrane flashing. Mechanically attach the new flashing continuously along the top edge. Apply manufacturer-approved flashing systems at all pipes, drains, metal drain boxes, and other projections. Provide and install new edge metal fabricated from 24-gauge galvanized steel with Kynar 500 coating. Color shall be selected by owner from manufacturer’s standard color chart.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
West Virginia University
Close: Feb 12, 2026
Provide the material, equipment, tools and labor necessary for the rehabilitation of the Towers PRT Station. Remove the existing roof, insulation, and wood deck down to the structural steel; remove loose membrane flashings; remove all debris from the roof and haul away to an approved landfill. Provide and install new 22-Gauge Galvanized B-Deck. Painting of the deck shall not be part of this project. Remove the existing lightning protection system. The installation of a new lightning protection system shall not be part of this project. Provide and install new wood blocking at the roof edge to the height of the new tapered insulation. Frame in the existing windows on the raised roof area with steel framing and plywood sheathing. Insulate the back side of the framed wall to prevent condensation. Flash the new wall with EPDM flashing. Apply a continuous layer of tapered insulation with a minimum thickness of 1.5” at the roof drain over the entire area Apply a 60 mil, fully adhered, EPDM rubber roof system over the new insulation At all walls and curbs, install membrane flashing. Mechanically attach the new flashing continuously along the top edge. Apply manufacturer-approved flashing systems at all pipes, drains, metal drain boxes, and other projections. Provide and install new edge metal fabricated from 24-gauge galvanized steel with Kynar 500 coating. Color shall be selected by owner from manufacturer’s standard color chart.
AvailableWest Virginia University
West Virginia University (WVU) issued an RFB to rehabilitate the Engineering PRT Station on the WVU Engineering Campus in Morgantown, WV; the work includes structural repairs, electrical upgrades, and compliance with WVU EH&S Contractor Safety Program. Bidders must be licensed contractors providing all materials, equipment, tools and labor; bids are due Feb 12, 2026 at 12:00 PM Eastern (EST). The contract period commences on Notice to Proceed with Substantial Completion expected by 2026-07-25 and Final Completion due by 2026-08-01.
Posted Date
Jan 20, 2026
Due Date
Feb 12, 2026
Release: Jan 20, 2026
West Virginia University
Close: Feb 12, 2026
West Virginia University (WVU) issued an RFB to rehabilitate the Engineering PRT Station on the WVU Engineering Campus in Morgantown, WV; the work includes structural repairs, electrical upgrades, and compliance with WVU EH&S Contractor Safety Program. Bidders must be licensed contractors providing all materials, equipment, tools and labor; bids are due Feb 12, 2026 at 12:00 PM Eastern (EST). The contract period commences on Notice to Proceed with Substantial Completion expected by 2026-07-25 and Final Completion due by 2026-08-01.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.