Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Bay City
Site survey, concept planning, detailed design, permitting, and supply and installation/construction.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Strathcona County
Strathcona County is seeking proposals from qualified proponents for the supply and installation of playground equipment for the Florian Park Playground located at 902 Regency Dr, Sherwood Park, AB T8A 5N4. The solicitation is open and includes supporting documents (RFP PDF, submission instructions, pricing and evaluation forms); submissions close on 2025-12-17 at 2:00 PM MST.
Posted Date
Nov 5, 2025
Due Date
Dec 17, 2025
Release: Nov 5, 2025
Strathcona County
Close: Dec 17, 2025
Strathcona County is seeking proposals from qualified proponents for the supply and installation of playground equipment for the Florian Park Playground located at 902 Regency Dr, Sherwood Park, AB T8A 5N4. The solicitation is open and includes supporting documents (RFP PDF, submission instructions, pricing and evaluation forms); submissions close on 2025-12-17 at 2:00 PM MST.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Estes Park
DESIGN/BUILD: Upgrade building entrance: modify the existing access points to the playground from the rear door to include a wheelchair-accessible ramp. Improve surfacing: install ADA-compliant surfacing materials that provide a safe and accessible path throughout the playground. Create inclusive play areas: include play areas for children with varying abilities, ensuring all children can interact and play together. Construct an ADA-compliant ramp at the rear childcare facility entrance. Remove and dispose of outdated play structures and surfacing. Upgrade exterior areas (pathways, signage, landscaping) for accessibility.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Town of Estes Park
Close: Jan 8, 2026
DESIGN/BUILD: Upgrade building entrance: modify the existing access points to the playground from the rear door to include a wheelchair-accessible ramp. Improve surfacing: install ADA-compliant surfacing materials that provide a safe and accessible path throughout the playground. Create inclusive play areas: include play areas for children with varying abilities, ensuring all children can interact and play together. Construct an ADA-compliant ramp at the rear childcare facility entrance. Remove and dispose of outdated play structures and surfacing. Upgrade exterior areas (pathways, signage, landscaping) for accessibility.
AvailableCity of Gardner
Design-Build. Seeking qualified and experienced design-build contractors for the design and construction of a new park playground. The project will include the design, supply, and installation of playground equipment, turf safety surfacing, and associated site work such as trail/sidewalk repair and minor grading as needed.
Posted Date
Nov 18, 2025
Due Date
Dec 9, 2025
Release: Nov 18, 2025
City of Gardner
Close: Dec 9, 2025
Design-Build. Seeking qualified and experienced design-build contractors for the design and construction of a new park playground. The project will include the design, supply, and installation of playground equipment, turf safety surfacing, and associated site work such as trail/sidewalk repair and minor grading as needed.
AvailableCity of Beatrice
Work includes approx. to Supply playground per specifications; CPSI Certified Playground installation; shipping playground materials to the site; receive and offload playground; store and securing playground equipment will be the responsibility of the contractor. Liability of playground equipment will be on contractor; site preparation will be needed, contractor will need to verify with a site visit to determine how much site work will be needed; site restoration as needed to restore disturbed areas; supply and installation of Turf or PIP surface under crickets play unit; supply and installation of concrete base for crickets; playground footprint will be no less than 60'x60'; supply and installation of 12" wood fiber in play area; supply and install border timbers around playground; work will be completed within 120 days of executed contract; other incidentals as indicated in the Contract Documents. See outside links for more details.
Posted Date
Nov 21, 2025
Due Date
Dec 11, 2025
Release: Nov 21, 2025
City of Beatrice
Close: Dec 11, 2025
Work includes approx. to Supply playground per specifications; CPSI Certified Playground installation; shipping playground materials to the site; receive and offload playground; store and securing playground equipment will be the responsibility of the contractor. Liability of playground equipment will be on contractor; site preparation will be needed, contractor will need to verify with a site visit to determine how much site work will be needed; site restoration as needed to restore disturbed areas; supply and installation of Turf or PIP surface under crickets play unit; supply and installation of concrete base for crickets; playground footprint will be no less than 60'x60'; supply and installation of 12" wood fiber in play area; supply and install border timbers around playground; work will be completed within 120 days of executed contract; other incidentals as indicated in the Contract Documents. See outside links for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →