CountyFL
Posted
Oct 20, 2026
Dec 3, 2026
Description: Design, supply, and installation of accessible playground equipment and associated amenities at the Port Franks Community Centre.
City · ON, CA
Decision makers connected to this RFP from Lambton Shores.
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CountyFL
Posted
Oct 20, 2026
Dec 3, 2026
Playground Equipment.
CityON
Posted
Oct 28, 2026
Dec 1, 2026
The City of Burlington seeks the design, supply, and installation of new playground and swing equipment at Earl Court Park, Kerns Park, Mountainside Park East, and Paul A. Fisher P.S. The installations will form part of the City's park construction contract in 2027. The solicitation lists a contract duration of six months.
Mobile County Public School System
School DistrictAL
Posted
Nov 13, 2026
Nov 30, 2026
Furnishing of Playground equipment includes, Slide - Double - Straight - 48" DH-46 1/2" for 3 1/2" Adventure Series; Superior Playgrounds Model: A480537XX, or approved equal, Qty 1 EA. Double Tire Climber - 60" DH - Entryless; Superior Playgrounds Model: TLU0061XX; or approved equal. Qty 5 EA.
School DistrictOK
Posted
Nov 12, 2026
Nov 26, 2026
Demolition, site preparation, construction, and installation of playground equipment and protective surfacing systems. Site 1 - Early Childhood Center, 200 S. Main St.: replacement of fall-zone surfacing with synthetic turf and engineered shock pad, shaded seating (approx. 2,828 SF). Site 2 - Elementary School, 529 Park St.: replacement of fallzone surfacing (approx. 4,760 SF). Site 3 - Intermediate School, 866 Arena Rd.: replacement of fall-zone surfacing (approx. 3,632 SF), shaded seating, and new gaga ball pit. Site 4 - Junior High School, 1100 Seikel Blvd.: new adolescent play area, gaga ball pit, and shaded seating. Fall zone around alternate handicapped swing area (approx. 480 SF). See Alternate(s) below: Site 5 - Vacant lot, corner 4 th and Oklahoma Streets, new playground construction, including sitework, drainage, and a themed twin-tower climbing structure. Alternate(s) - Existing playground at 4th St. and Oklahoma Ave.: surfacing replacement (approx. 3,114 SF total fall zone) and handicapped swing area at Jr High (1100 Seikel Blvd.) with (approx. 480 SF fall zone).