Closing soon

Playground Construction, Equipment, and Synthetic Surfacing Systems RFP

Description: Demolition, site preparation, construction, and installation of playground equipment and protective surfacing systems. Site 1 - Early Childhood Center, 200 S. Main St.: replacement of fall-zone surfacing with synthetic turf and engineered shock pad, shaded seating (approx. 2,828 SF). Site 2 - Elementary School, 529 Park St.: replacement of fallzone surfacing (approx. 4,760 SF). Site 3 - Intermediate School, 866 Arena Rd.: replacement of fall-zone surfacing (approx. 3,632 SF), shaded seating, and new gaga ball pit. Site 4 - Junior High School, 1100 Seikel Blvd.: new adolescent play area, gaga ball pit, and shaded seating. Fall zone around alternate handicapped swing area (approx. 480 SF). See Alternate(s) below: Site 5 - Vacant lot, corner 4 th and Oklahoma Streets, new playground construction, including sitework, drainage, and a themed twin-tower climbing structure. Alternate(s) - Existing playground at 4th St. and Oklahoma Ave.: surfacing replacement (approx. 3,114 SF total fall zone) and handicapped swing area at Jr High (1100 Seikel Blvd.) with (approx. 480 SF fall zone).

Buyer
McLoud School District

SchoolDistrict · OK, US

Released
Nov 12, 2026
Closes
Nov 26, 2026(9 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts