Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-Build: Work includes Design, furnish, and installation of new insulated attic space, membrane roofing system, rain gutters, downspouts, metal coping, and edge metal conforming to all applicable codes. Access to the new attic space is required for maintenance, operations, and future replacements. New roofing system shall carry a 20-year minimum warranty covering materials, workmanship, wind speeds up to 90 mph and a hail writer covering up to 1,5” hail. • Design, furnish, and installation of a new residential-type HVAC system capable of providing heating and cooling to the entire facility and fitting the new attic space. The new HVAC shall conform to all applicable codes. • Demolition and removal of existing baseboard heaters and associated electrical components. Utilize existing electrical outlets where required.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN-BUIlD The remediation, structural replacement, Historical window and siding installation, and interior finish.
Posted Date
Nov 7, 2025
Due Date
Dec 16, 2025
Release: Nov 7, 2025
Close: Dec 16, 2025
DESIGN-BUIlD The remediation, structural replacement, Historical window and siding installation, and interior finish.
AvailableDesign-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
provide design and construction of improvements to the Main Water Treatment Plant.
Posted Date
Oct 15, 2025
Due Date
Dec 11, 2025
Release: Oct 15, 2025
Close: Dec 11, 2025
provide design and construction of improvements to the Main Water Treatment Plant.
Design-Build Exterior Building Maintenance and Fall Protection System. To provide proposals to design and install the new Exterior Building Maintenance and Fall Protection systems at the project.
Posted Date
Nov 19, 2025
Due Date
Dec 12, 2025
Release: Nov 19, 2025
Close: Dec 12, 2025
Design-Build Exterior Building Maintenance and Fall Protection System. To provide proposals to design and install the new Exterior Building Maintenance and Fall Protection systems at the project.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis