Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DESIGN BUILD services for brayton park facility improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
DESIGN/BUILD: Upgrade building entrance: modify the existing access points to the playground from the rear door to include a wheelchair-accessible ramp. Improve surfacing: install ADA-compliant surfacing materials that provide a safe and accessible path throughout the playground. Create inclusive play areas: include play areas for children with varying abilities, ensuring all children can interact and play together. Construct an ADA-compliant ramp at the rear childcare facility entrance. Remove and dispose of outdated play structures and surfacing. Upgrade exterior areas (pathways, signage, landscaping) for accessibility.
Posted Date
Dec 2, 2025
Due Date
Jan 8, 2026
Release: Dec 2, 2025
Close:
Premium
Access the largest public sector contact database
DESIGN/BUILD: Upgrade building entrance: modify the existing access points to the playground from the rear door to include a wheelchair-accessible ramp. Improve surfacing: install ADA-compliant surfacing materials that provide a safe and accessible path throughout the playground. Create inclusive play areas: include play areas for children with varying abilities, ensuring all children can interact and play together. Construct an ADA-compliant ramp at the rear childcare facility entrance. Remove and dispose of outdated play structures and surfacing. Upgrade exterior areas (pathways, signage, landscaping) for accessibility.
AvailableDESIGN/BUILD: services for the aviation maintenance facility project. Design-build shall provide complete design, engineering, estimating, scheduling, construction management and energy efficiency services.
Posted Date
Dec 4, 2025
Due Date
Jan 15, 2026
Release: Dec 4, 2025
Close: Jan 15, 2026
DESIGN/BUILD: services for the aviation maintenance facility project. Design-build shall provide complete design, engineering, estimating, scheduling, construction management and energy efficiency services.
AvailableDESIGN-BUILD. Providing demolition of existing splash pad and a splash pad design and installation in connection with harry myers park splash pad. project is for the design and installation of an approximately 4,000 square feet facility area including seating area with sidewalk border around the splash pad with an approximate 2,000 SY splash pad
Posted Date
Dec 4, 2025
Due Date
Dec 22, 2025
Release: Dec 4, 2025
Close: Dec 22, 2025
DESIGN-BUILD. Providing demolition of existing splash pad and a splash pad design and installation in connection with harry myers park splash pad. project is for the design and installation of an approximately 4,000 square feet facility area including seating area with sidewalk border around the splash pad with an approximate 2,000 SY splash pad
AvailableDesign-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis