Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
DEISGN-BUILD teams to submit proposals to provide comprehensive design and construction services for capital improvements. The objective is to complete necessary renovations, upgrades, and amenities to enhance the learning environment, address facility needs, and align with the schools mission of providing an international, multilingual education while instilling cultural awareness, respect, and tolerance for others.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Design-build services for Phase 1 capital improvements at International Charter School of Atlanta's Upper Campus, including entrance and student drop-off canopies, sidewalks, landscaping, and parking lot repaving.
Posted Date
Jan 7, 2026
Due Date
Feb 4, 2026
Release: Jan 7, 2026
Close: Feb 4, 2026
Design-build services for Phase 1 capital improvements at International Charter School of Atlanta's Upper Campus, including entrance and student drop-off canopies, sidewalks, landscaping, and parking lot repaving.
AvailableDESIGN-BUILD: Design-Build methodology of design, demolition and construction of Phase 1 and the preliminary infrastructure design and phasing plan.
Posted Date
Dec 15, 2025
Due Date
Feb 6, 2026
Release: Dec 15, 2025
Close: Feb 6, 2026
DESIGN-BUILD: Design-Build methodology of design, demolition and construction of Phase 1 and the preliminary infrastructure design and phasing plan.
AvailableDesign-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.
Posted Date
Nov 25, 2025
Due Date
Jan 29, 2026
Release: Nov 25, 2025
Close: Jan 29, 2026
Provide design and bidding phase services for the allen park improvements design - phase A. Project including, but not limited to, a 5-12-year-old playground, 2-5-year-old playground, open-air shelter, stormwater improvements, and americans with disabilities act (ada) parking amenities in phase a.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
Provide design and bidding phase services for the allen park improvements design - phase A. Project including, but not limited to, a 5-12-year-old playground, 2-5-year-old playground, open-air shelter, stormwater improvements, and americans with disabilities act (ada) parking amenities in phase a.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Design-build contract for ada improvements. Scope includes complete design, demolition, reconstruction, testing, and commissioning of all work as outlined in the solicitation documents. Major components: new elevator / installation -holeless hydraulic elevator. Staircase construction -replacing 3 existing escalators with a new staircase. Supporting infrastructure -temporary barriers will be installed to allow safe passenger access during construction. Work includes: demolition of existing escalators and slabs; construction of the new staircase and elevator (with a control room); installation of associated electrical, mechanical, fire protection, plumbing, safety, and signage systems to meet code and operational requirements.