Summary
Project includes design-builder shall provide complete design, engineering, estimating scheduling, construction management, and energy services. Several components of the HVAC system at the Fergus Falls campus are at the end of useful life, and both heating and cooling systems are decentralized, resulting in increased energy consumption and operational inefficiencies. This project will centralize and update the heating and cooling plants. Instead of a “like for like” replacement, the campus has decided to pursue a geothermal heating and cooling system for the project. Additional improvements such as building automation system and backup generator upgrades are also included. The project is being procured using the design-build delivery model.