Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Addition to the existing golf cart wing of the the clubhouse building. Work will include the expansion of the unfinished, unisualted portion of the building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Renovation & Addition to the existing golf cart barn building. Work will include improvements to the existing unfinished, uninsulate PEMB building and two small wood framed additions.
Posted Date
Dec 10, 2025
Due Date
Dec 31, 2025
Release: Dec 10, 2025
Close: Dec 31, 2025
Renovation & Addition to the existing golf cart barn building. Work will include improvements to the existing unfinished, uninsulate PEMB building and two small wood framed additions.
AvailablePremium
Access the largest public sector contact database
Provide construction services. The construction will occur at an existing outbuilding, "cart barn". The state of the current floor is a combination of gravel and broken old asphalt, request is being made for the current floor to be removed and replaced with concrete. Work includes removal of old flooring materials; site preparation and grading for new flooring; forming and reinforcement (rebar) as needed; pouring and finishing of concrete; surface finish as requested (smooth); any necessary control joints or relief cuts; cleanup and disposal of any waste. 2,080 sqft existing floor replacement (4" 3,000-4,000psi); 1,440 sqft full addition (4" 3,000-4,0000psi); 1,080 sqft partial addition (4" 3,000-4,000psi).
Posted Date
Nov 21, 2025
Due Date
Dec 22, 2025
Release: Nov 21, 2025
Close: Dec 22, 2025
Provide construction services. The construction will occur at an existing outbuilding, "cart barn". The state of the current floor is a combination of gravel and broken old asphalt, request is being made for the current floor to be removed and replaced with concrete. Work includes removal of old flooring materials; site preparation and grading for new flooring; forming and reinforcement (rebar) as needed; pouring and finishing of concrete; surface finish as requested (smooth); any necessary control joints or relief cuts; cleanup and disposal of any waste. 2,080 sqft existing floor replacement (4" 3,000-4,000psi); 1,440 sqft full addition (4" 3,000-4,0000psi); 1,080 sqft partial addition (4" 3,000-4,000psi).
AvailableRenovate and operate a golf professional shop, driving range and golf cart concession.
Posted Date
Nov 13, 2025
Due Date
Dec 29, 2025
Release: Nov 13, 2025
Close: Dec 29, 2025
Renovate and operate a golf professional shop, driving range and golf cart concession.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis