Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes full replacement of two golf cart bridges. Provide full demolition, removal, engineering, fabrication, & installation of two new golf cart/pedestrian bridges. Remove existing bridge superstructures (steel girders, decking, nailers). Remove concrete abutments and footings where compromised. Maintain environmental controls during demolition. Provide signed and sealed engineering drawings, including structural, civil, and geotechnical components. New reinforced concrete abutments resistant to scour and overtopping. Galvanized or weathering steel girders. Composite or pressure-treated decking system. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Renovation & addition to the existing golf cart barn building.
Posted Date
Dec 10, 2025
Due Date
Feb 11, 2026
Release: Dec 10, 2025
Close: Feb 11, 2026
Renovation & addition to the existing golf cart barn building.
AvailableAddition to the existing golf cart wing of the the clubhouse building.
Posted Date
Dec 10, 2025
Due Date
Feb 11, 2026
Release: Dec 10, 2025
Close: Feb 11, 2026
Addition to the existing golf cart wing of the the clubhouse building.
AvailableDennis Highland Golf Cart Barn Addition Project.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
Dennis Highland Golf Cart Barn Addition Project.
AvailableBridge replacement program.
Posted Date
Dec 19, 2025
Due Date
Jan 27, 2026
Release: Dec 19, 2025
Close: Jan 27, 2026
Bridge replacement program.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis