Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide demolition, asbestos abatement, hazardous materials handling, and environmental remediation services for fire-damaged downtown properties.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work consist of demolition & remediation services.
Posted Date
Dec 30, 2025
Due Date
Jan 28, 2026
Release: Dec 30, 2025
Close: Jan 28, 2026
Work consist of demolition & remediation services.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide environmental health remediation service district wide to fulfill all the details of remediation for fire, water, and mold to bring the area back to normal conditions.
Posted Date
Jun 18, 2025
Due Date
Jul 3, 2027
Release: Jun 18, 2025
Close: Jul 3, 2027
Provide environmental health remediation service district wide to fulfill all the details of remediation for fire, water, and mold to bring the area back to normal conditions.
AvailableWork includes removal and disposal of regulated asbestos-containing material (racm) consisting of pipe/boiler insulation, window caulking and glazing, wall/ceiling and compressor insulation, ductwork insulation, floor debris, and rope; universal waste consisting of fluorescent light tubes, high intensity discharge (hid) bulbs, thermostats, thermometers, etc; and other hazardous/regulated materials including fluorescent light fixtures/ballasts, numerous storage drums/containers, and fire extinguishers. The building includes a total floor plan area of approx 138,900 SF and contains six stories with each story covering approx 23,150 SF and a partial basement.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Work includes removal and disposal of regulated asbestos-containing material (racm) consisting of pipe/boiler insulation, window caulking and glazing, wall/ceiling and compressor insulation, ductwork insulation, floor debris, and rope; universal waste consisting of fluorescent light tubes, high intensity discharge (hid) bulbs, thermostats, thermometers, etc; and other hazardous/regulated materials including fluorescent light fixtures/ballasts, numerous storage drums/containers, and fire extinguishers. The building includes a total floor plan area of approx 138,900 SF and contains six stories with each story covering approx 23,150 SF and a partial basement.
AvailableConstruction of the supplemental environmental remediation which includes remedial capping. The base bid includes partial demolition of existing concrete walls and piles, grading, and earthwork, lawn seeding, erosion and sediment control measures.
Posted Date
Dec 30, 2025
Due Date
Feb 4, 2026
Release: Dec 30, 2025
Close: Feb 4, 2026
Construction of the supplemental environmental remediation which includes remedial capping. The base bid includes partial demolition of existing concrete walls and piles, grading, and earthwork, lawn seeding, erosion and sediment control measures.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →