Cottonwood Elevated Storage Tank Wood Elevated Storage Tank RFP
Construction of the 2.0 mg elevated storage tank elevated storage tank project.
Description: The Project includes the following Work: Construction of a new 400,000-gallon, single-pedestal spheroid, elevated storage tank.
City · WI, US
Adjacent opportunities open for bidding right now.
CityTX
Posted
Oct 25, 2026
Dec 9, 2026
Construction of the 2.0 mg elevated storage tank elevated storage tank project.
CityAL
Posted
Nov 13, 2026
Dec 16, 2026
Principal items of work include surface preparation and painting of all interior and exterior surfaces of the existing 75,000-gallon multi-column elevated water storage tank (Tank No. 1), including full draping/containment, removal and disposal of existing coatings (anticipated to contain lead), relocation of the AMI antenna to a new welded mount, catwalk, handrail and overflow modifications, and related miscellaneous repairs.
Special DistrictTX
Posted
-
Jan 14, 2027
Construction of a new 2.0-million-gallon (MG) elevated storage tank at the Patton site. Work includes associated yard piping, security fencing, site lighting, drainage, electrical systems, and instrumentation and controls. The procurement requires electronic sealed proposals with a minimum bid bond equal to five percent of the total proposal price, and includes non-mandatory pre-proposal and site visit meetings; proposals will be publicly opened and read via WebEx.
CityAL
Posted
-
Dec 16, 2026
The City of Loxley is seeking sealed bids to renovate its existing 75,000-gallon multi-column elevated water storage tank at 1087 North Holley Street. Work includes preparing and painting the tank’s interior and exterior, containing and removing existing coatings anticipated to contain lead, relocating the AMI antenna, and modifying the catwalk, handrail, and overflow, along with related repairs. Bids are due at City Hall by 10:00 a.m. on December 16, 2026; the contract allows 45 calendar days to substantial completion and 55 days to final completion.