Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of deer park playground improvement project, include removal of existing playground, excavation, placement of material, loading, hauling and disposal of existing engineered wood fiber, construction of footings, underground drain; installation of new pour in place play surfacing and city supplied play equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Ellsworth is soliciting sealed proposals from qualified playground equipment manufacturers and/or installers for a turnkey replacement of the playground at Knowlton Park, including a large commercial-grade cabled-system climbing structure targeted for installation in May 2026. The RFP was issued January 12, 2026; a site walk is scheduled for February 4, 2026; questions are due February 26, 2026; proposals are due March 5, 2026; and the City anticipates awarding on March 17, 2026. Proposals must be submitted sealed to Roddy Ehrlenbach, Director, Parks, Recreation & Facilities, at City Hall (1 City Hall Plaza, Ellsworth, ME), and late submissions will not be considered.
Posted Date
Jan 12, 2026
Due Date
Mar 5, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Mar 5, 2026
The City of Ellsworth is soliciting sealed proposals from qualified playground equipment manufacturers and/or installers for a turnkey replacement of the playground at Knowlton Park, including a large commercial-grade cabled-system climbing structure targeted for installation in May 2026. The RFP was issued January 12, 2026; a site walk is scheduled for February 4, 2026; questions are due February 26, 2026; proposals are due March 5, 2026; and the City anticipates awarding on March 17, 2026. Proposals must be submitted sealed to Roddy Ehrlenbach, Director, Parks, Recreation & Facilities, at City Hall (1 City Hall Plaza, Ellsworth, ME), and late submissions will not be considered.
AvailableWork generally includes removals, installation of playground equipment, concrete paving, engineered wood fiber surfacing, and lawn restoration.
Posted Date
Jan 6, 2026
Due Date
Jan 20, 2026
Release: Jan 6, 2026
Close: Jan 20, 2026
Work generally includes removals, installation of playground equipment, concrete paving, engineered wood fiber surfacing, and lawn restoration.
AvailableProvide professional services for the installation of site improvements associated with a new playground.
Posted Date
-
Due Date
Jan 29, 2026
Close: Jan 29, 2026
Provide professional services for the installation of site improvements associated with a new playground.
AvailableThis project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
Posted Date
Dec 9, 2025
Due Date
Jan 22, 2026
Release: Dec 9, 2025
Close: Jan 22, 2026
This project consists of newly constructed and refurbished park elements within the Park site, as well as a new sidewalk. Work inside the park includes, but is not limited to: new and repaved asphalt multi-use trails; pre-cast concrete retaining walls; custom handrails; a pre-fabricated bridge crossing; concrete walks, ADA ramps, and pedestrian plaza areas; repaving of paved driveways and parking areas; realignment, regrading, and paving of drive aisles and ADA parking; renovation of a restroom facility, enhancements to storm water structures; addition of green infrastructure and enhanced swales; new dam installations; streambank restoration and slope stabilization; installation of chain link fencing; general landscape improvements; and other items as shown in the plans and specifications.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →