Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide consulting, design, and engineering services for the deer creek streamflow restoration and culvert replacement project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes: Treat and control invasive holly, laurel, horse chestnut, Itadori knotweed, blackberry, English and ivy; install erosion control measures; plant approx .55 acres of gaps and open areas.
Posted Date
Nov 19, 2025
Due Date
Jan 17, 2026
Release: Nov 19, 2025
Close: Jan 17, 2026
Work includes: Treat and control invasive holly, laurel, horse chestnut, Itadori knotweed, blackberry, English and ivy; install erosion control measures; plant approx .55 acres of gaps and open areas.
AvailablePremium
Access the largest public sector contact database
Provide services to prepare the design and permit package for installing culvert(s) within the city's canal system.
Posted Date
Nov 13, 2025
Due Date
Dec 22, 2025
Release: Nov 13, 2025
Close: Dec 22, 2025
Provide services to prepare the design and permit package for installing culvert(s) within the city's canal system.
AvailableRequest for Qualifications for Owner's Project Management Services for the roof restoration of the Lincoln-Sudbury Regional High School.
Posted Date
-
Due Date
Dec 18, 2025
Close: Dec 18, 2025
Request for Qualifications for Owner's Project Management Services for the roof restoration of the Lincoln-Sudbury Regional High School.
AvailablePerform design elements for the following: Excavate backwater channels to create floodplain storage and rearing and refuge habitat; identify significant trees to save and protect that will maximize environmental benefit; remove invasive vegetations and plant native shrubs and trees with strategic use of bioengineering techniques; strategically place log jams and large woody debris int he main channel, near backwater channel entrances and within expanded floodplain to help stabilize the stream bank and create hard toe points where additional stabilization is needed; remove bank armor along select locations of the main channel and at backwater channel entrances; define outer limits of channel migration zone to protect infrastructure and private properties; and provide a walking trail with channel access points and interpretive signage.
Posted Date
Nov 13, 2025
Due Date
Dec 15, 2025
Release: Nov 13, 2025
Close: Dec 15, 2025
Perform design elements for the following: Excavate backwater channels to create floodplain storage and rearing and refuge habitat; identify significant trees to save and protect that will maximize environmental benefit; remove invasive vegetations and plant native shrubs and trees with strategic use of bioengineering techniques; strategically place log jams and large woody debris int he main channel, near backwater channel entrances and within expanded floodplain to help stabilize the stream bank and create hard toe points where additional stabilization is needed; remove bank armor along select locations of the main channel and at backwater channel entrances; define outer limits of channel migration zone to protect infrastructure and private properties; and provide a walking trail with channel access points and interpretive signage.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis