Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work varies in scope from complete deck replacements to new deck surfaces and stair stringer replacements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Bridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailablePremium
Access the largest public sector contact database
Work include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
Posted Date
Dec 2, 2025
Due Date
Jan 7, 2026
Release: Dec 2, 2025
Close: Jan 7, 2026
Work include deck removal and replacement, new concrete barrier at the curb line, bridge sidewalk removal and widening and furnishing and installation of deterrent fencing. The project shall include all stages of the work-zone traffic control, furnishing and installation of all materials, access, installation and removal of approved "scaffolding/shielding" system and isolated lead abatement.
AvailableWork consists of lodge deck project is a complete demo and rebuild of current decking using treated lumber boards. Includes Demo existing deck structure in full; Furnish and install new joist stringers under deck structure. Ground contact lumber to be used where needed; Furnish and install exact size matched decking lumber – 2 ¼” x 9” treated lumber boards; Furnish and install using weather resistant deck screws and hangers for all fasteners and tie downs.
Posted Date
Nov 25, 2025
Due Date
Dec 24, 2025
Release: Nov 25, 2025
Close: Dec 24, 2025
Work consists of lodge deck project is a complete demo and rebuild of current decking using treated lumber boards. Includes Demo existing deck structure in full; Furnish and install new joist stringers under deck structure. Ground contact lumber to be used where needed; Furnish and install exact size matched decking lumber – 2 ¼” x 9” treated lumber boards; Furnish and install using weather resistant deck screws and hangers for all fasteners and tie downs.
AvailableIllinois Department of Transportation is soliciting bids to remove and replace the bridge deck wearing surface and perform related rehabilitation on two structures carrying IL 251 over I-80 in LaSalle County. The scope includes deck patching, expansion joint and bearing replacement, concrete repairs, HMA shoulder work, pavement striping, and associated traffic control. This is a construction solicitation (not a grant) that is part of the January 16, 2026 letting.
Posted Date
Nov 17, 2025
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Illinois Department of Transportation is soliciting bids to remove and replace the bridge deck wearing surface and perform related rehabilitation on two structures carrying IL 251 over I-80 in LaSalle County. The scope includes deck patching, expansion joint and bearing replacement, concrete repairs, HMA shoulder work, pavement striping, and associated traffic control. This is a construction solicitation (not a grant) that is part of the January 16, 2026 letting.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis