Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Deadbreak, cold shrink, tee body with shear bolt lug, 300-500kcmil cable range, 35kv, 600a. Shall meet or exceed the requirements of ieee std. 386 as last revised. Each body shall be production tested for partial discharge, ac withstand, and dc impulse testing per ieee 386. Capable of accepting copper or aluminum; longitudinally corrogated tape, or wire shielded cables. A cable preparation template shall be included for both. Does not require a cable adapter or any additional heat source for installation. Shall include a capacitive test point, bi-metal shear bolt lug, a 35kv insulating plug with cap, a 36 inch length solderblocked grounding braid, and constant force spring. Shear bolt lug shall feature stepless shear-off bolts with no predetermined shear-off points to ensure the correct shear off torque will be achieved. The shear bolt lug inner tube surface shall feature transverse grooves, and shall be pre-loaded with inhibitor. The lug shall have centering rings to minimize risk, ofvoltage stress at the transition from the lug body to the cable insulation. The shear bolt shall feature a friction disc in the bottom to allow for independent contact force of aluminum and copper conductors. "richards" #63csht2pr3-dwp, 102 each.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Heat Shrink, Stock Number 1680LLF02M008, Part Number 0U583 M23053/12-515-2, Part Number 81205 M23053/12-515-2.
Posted Date
Dec 17, 2025
Due Date
Jan 16, 2026
Release: Dec 17, 2025
Close: Jan 16, 2026
Heat Shrink, Stock Number 1680LLF02M008, Part Number 0U583 M23053/12-515-2, Part Number 81205 M23053/12-515-2.
AvailableConstruct scaffolding; shrink wrap enclosure; remove shrink wrap; remove scaffolding; option to extend.
Posted Date
Dec 17, 2025
Due Date
Jan 15, 2026
Release: Dec 17, 2025
Close: Jan 15, 2026
Construct scaffolding; shrink wrap enclosure; remove shrink wrap; remove scaffolding; option to extend.
AvailableThe USDA Natural Resources Conservation Service (West Virginia) seeks contractors to perform rehabilitation work on Brush Creek 15 Dam in Mercer County, WV, including clearing and grubbing, removal of existing structures, trench drain abandonment, and placement of non-shrink grout via tremie hose. The project requires compliance with federal, state, and local regulations and submission of specific plans (Clearing & Grubbing Plan, Demolition Plan, Trench Drain Abandonment Plan) for approval. Bidders must follow the solicitation specifications and drawings available from the official posting on the West Virginia procurement portal.
Posted Date
Dec 31, 2025
Due Date
Jan 14, 2026
Release: Dec 31, 2025
Close: Jan 14, 2026
The USDA Natural Resources Conservation Service (West Virginia) seeks contractors to perform rehabilitation work on Brush Creek 15 Dam in Mercer County, WV, including clearing and grubbing, removal of existing structures, trench drain abandonment, and placement of non-shrink grout via tremie hose. The project requires compliance with federal, state, and local regulations and submission of specific plans (Clearing & Grubbing Plan, Demolition Plan, Trench Drain Abandonment Plan) for approval. Bidders must follow the solicitation specifications and drawings available from the official posting on the West Virginia procurement portal.
4.5 oz. per Sq. Yd. Tubular Knit Jersey, Yarn blend 50/50 Poly/Long Staple Cotton, 26/1 First Quality Yarn, CPI = 32 - 36, WPI = 28 - 32, width: 19". Anti-Shrink No Resin Finish, Roll Size = 35-45lbs. with 2" to 2-1/2" core. Rolls must be poly bagged with labels on ends. Labels must include weight, width, and mill name. Vendor must color match to White, Pantone #11-4800 TPX or agency approved equivalent.
Posted Date
Sep 30, 2025
Due Date
Jan 9, 2026
Release: Sep 30, 2025
Close: Jan 9, 2026
4.5 oz. per Sq. Yd. Tubular Knit Jersey, Yarn blend 50/50 Poly/Long Staple Cotton, 26/1 First Quality Yarn, CPI = 32 - 36, WPI = 28 - 32, width: 19". Anti-Shrink No Resin Finish, Roll Size = 35-45lbs. with 2" to 2-1/2" core. Rolls must be poly bagged with labels on ends. Labels must include weight, width, and mill name. Vendor must color match to White, Pantone #11-4800 TPX or agency approved equivalent.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis