Open RFP

Dead Run at Georgetown Pike - Invitation for Pre-Qualification

Description: Work includes restoration of 5,916 LF of stream using natural channel design and riparian corridor enhancements to improve water quality. Invasive plants will be removed and replaced with native trees, shrubs, and herbaceous at vegetation. Additionally, the project requires a sanitary sewer force main bypass pumping system with flows up to 2027 pike 2,600 gal per minute, requiring continuous 24-hour operation and maintenance while the bypass system is in service, as well as pre- and post-construction cctv inspection of the sanitary sewer force main.

Buyer
Fairfax County

County · VA, US

Released
Nov 14, 2026
Closes
Dec 4, 2026(17 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts