Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 2,550 SY 7"-8" plain concrete pavement; 42,000 SF 4"-8" concrete sidewalk.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The scope of the work, without limiting the generality thereof, includes all labor, materials, tools, equipment and supervision to provide excavation and paving services and also includes concrete infrastructure additions and repairs, additions and repairs to existing campus utility infrastructure as well as additions and repairs to campus pedestrian pathways on an as needed basis.
Posted Date
Jan 14, 2026
Due Date
Jan 29, 2026
Release: Jan 14, 2026
Close: Jan 29, 2026
The scope of the work, without limiting the generality thereof, includes all labor, materials, tools, equipment and supervision to provide excavation and paving services and also includes concrete infrastructure additions and repairs, additions and repairs to existing campus utility infrastructure as well as additions and repairs to campus pedestrian pathways on an as needed basis.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of construction services for new ADA compliant concrete sidewalks and ramps, including associated civil, electrical, and landscaping work, along S. Main Street in Ann Arbor, Michigan.
Posted Date
-
Due Date
Feb 19, 2026
Release: -
Close: Feb 19, 2026
Procurement of construction services for new ADA compliant concrete sidewalks and ramps, including associated civil, electrical, and landscaping work, along S. Main Street in Ann Arbor, Michigan.
AvailableThe City of Shelton, WA is inviting sealed bids for the Downtown Street Tree and Sidewalk Repair project (ITB #26-002-LPW). Work involves removal and replacement of select downtown street trees and associated sidewalk/curb repairs to address uplift and pedestrian safety. Bids open January 8, 2026 and are due by February 3, 2026 at 1:00 PM local time.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
The City of Shelton, WA is inviting sealed bids for the Downtown Street Tree and Sidewalk Repair project (ITB #26-002-LPW). Work involves removal and replacement of select downtown street trees and associated sidewalk/curb repairs to address uplift and pedestrian safety. Bids open January 8, 2026 and are due by February 3, 2026 at 1:00 PM local time.
AvailableConstruction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →