Open RFPDCSD - Roosevelt Middle School Renovation RFP
Description: In general, the Work consists of 2 additions to the existing middle school. Addition 1 is an approx 8,500 SF addition to the west side of the existing gymnasium to serve as a multipurpose space as well as the storm shelter. Addition 2 is approx 39,000 SF added to the north side of the central classroom wing and will provide additional classrooms, and a new media center. The work will also include the remodeling of numerous spaces within the existing school building, including the conversion of the existing media center into a new centrally located administrative suite. General construction includes a spread footing system for the entire facility, structural steel frame and precast concrete walls at the multipurpose addition. Building exterior consists of a combination of brick and masonry units, metal wall panels, aluminum curtain wall and storefront, and single-ply membrane roofing. The Work also includes fire protection system, plumbing, HVAC, communication system, and electrical work. The campus sitework includes modifications to the existing grades, limited site improvements, and expanded paved drop off areas for buses and parents pavement.