Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
Total student enrollment.
National Center for Education Statistics identifier.
Total number of schools in the district.
Total number of staff members.
Highest grade level offered.
How easy their procurement process is to navigate.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Dubuque Community School District
Purchase of replacement school bus chassis and bodies. Body and chassis - integrated unit bid: base bid - five (5) units included. Standard floor 65 passenger body - five (5) units with diesel engine, with allison transmission. See attached file.
Posted Date
-
Due Date
May 21, 2026
Dubuque Community School District
Close: May 21, 2026
Purchase of replacement school bus chassis and bodies. Body and chassis - integrated unit bid: base bid - five (5) units included. Standard floor 65 passenger body - five (5) units with diesel engine, with allison transmission. See attached file.
Dubuque Community School District
Work will include complete removal of the existing playground structures, installation of the new playground structure and ground cover, and other site improvements.
Posted Date
-
Due Date
Mar 26, 2026
Dubuque Community School District
Close: Mar 26, 2026
Work will include complete removal of the existing playground structures, installation of the new playground structure and ground cover, and other site improvements.
Dubuque Community School District
The scope of work for the project includes, but is not limited to the following: The removal of existing fuel oil powered boiler burners and associated fuel oil system pumps, piping, accessories, controls, below ground tanks, and supporting portions of the building's electrical system. The installation of new LP powered boiler burners and associated LP system piping, accessories, controls, vaporizer, (3) 1,000 gallon above ground storage tanks, and supporting electrical materials. The provision of new concrete tank supports, a new concrete slab, and new fencing to protect the equipment and building occupants. Removal and replacement of existing on-site construction, earth, and concrete to facilitate the removal of the fuel oil system and the installation of the new LP system.
Posted Date
-
Due Date
Mar 26, 2026
Dubuque Community School District
Close: Mar 26, 2026
The scope of work for the project includes, but is not limited to the following: The removal of existing fuel oil powered boiler burners and associated fuel oil system pumps, piping, accessories, controls, below ground tanks, and supporting portions of the building's electrical system. The installation of new LP powered boiler burners and associated LP system piping, accessories, controls, vaporizer, (3) 1,000 gallon above ground storage tanks, and supporting electrical materials. The provision of new concrete tank supports, a new concrete slab, and new fencing to protect the equipment and building occupants. Removal and replacement of existing on-site construction, earth, and concrete to facilitate the removal of the fuel oil system and the installation of the new LP system.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Procurement guidance and navigation tips.
Lower scores indicate easier procurement processes. Created by Starbridge.
Sole Source: Not viable for new vendors; redirect to RFP or AEA Purchasing.
Coops: If your offering is on AEA, ask Business Services to procure via that contract.
Dubuque Community School District, IA adheres strictly to competitive bidding; sole source is not a viable path for new vendors. Only one documented high-value sole-source relationship exists (HP).
Board meetings and strategic plans from Dubuque Community School District
The meeting included a review of the district strategic plan, detailing progress on five priority initiatives, including instructional improvements, family engagement, and staff development. The Board approved a contract with INVISION Architecture, LLC for the Roosevelt Middle School renovation project and set a date for a public hearing regarding a Flexibility Account Transfer Request. Additionally, the meeting featured a resignation announcement from a Board member and a tour of the Keystone AEA building to evaluate potential acquisition opportunities.
The board meeting included a review of the district's strategic plan and progress on priority initiatives. Key discussion topics included updates on the preschool program offerings, including the possibility of full-day preschool or transitional kindergarten, and the implementation of a tiered system of support (MTSS) in middle schools, which utilizes I-Ready data to track student learning and provide interventions. The board also approved an agreement for the Roosevelt Middle School additions and renovation project and set a date for a public hearing regarding a flexibility account transfer request.
The board convened for a special meeting to conduct a closed session for the purpose of a superintendent evaluation pursuant to Iowa Code. Following the closed session, the board returned to regular session and briefly discussed the scheduling of a potential future closed session related to a Strategic Plan Committee meeting.
The board meeting included several recognitions of school staff and student achievements. The board conducted public hearings and adopted the budget estimate for fiscal 2026-2027, as well as plans and contracts for the Irving Elementary roof and playground replacement projects and the Sageville Elementary fuel oil tank replacement project. Additionally, the board approved a construction contract for the Dalzell South retaining wall repairs, authorized the issuance of $30,000,000 in school infrastructure sales tax revenue bonds, and approved the termination of three probationary teaching contracts.
The meeting included a closed session conducted pursuant to Iowa Code to evaluate professional competency, followed by a return to the regular session. Key agenda items included a comprehensive review of the 2024-2029 District Strategic Plan, with updates provided on priority initiatives such as enhancing instructional methods, increasing engagement with families and staff, streamlining operations, and fostering leadership opportunities for staff retention. The Board confirmed that multiple strategic action steps are currently on track, completed, or operational.
Extracted from official board minutes, strategic plans, and video transcripts.
Track Dubuque Community School District's board meetings, strategic plans, and budget discussions. Identify opportunities 6-12 months before competitors see the RFP.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Decision Makers
Business Manager, Administrative Services (Hempstead High School)
Premium
Access the largest public sector contact database
© 2026 Starbridge