Washington Metropolitan Area Transit Authority
Special DistrictDC
Posted
Oct 23, 2026
Dec 2, 2026
DBE FRSMP277009/JLM-Lighting Phase 2
WMATA seeks proposals for the Site Lighting Phase 2 Project to replace and upgrade site lighting infrastructure at multiple Metrorail stations. The work includes removing existing lighting and installing new LED lighting systems, poles, foundations, conduit, wiring, utility boxes, and related electrical infrastructure, along with the labor, materials, equipment, permits, testing, and commissioning required. The contract, if awarded, will be federally funded; solicitation documents are available through Procore by request to WMATA’s Contract Administrator.
