Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Knoxville Utilities Board is soliciting bids for sewer rehabilitation work in the Davida–Kentwood area of Knoxville, Tennessee. The project involves rehabilitation of wastewater collection system assets according to KUB’s specifications. Proposals are due via the KUB BidNet Direct portal by January 20, 2026 at 2:00 PM EST.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Hayward issued a solicitation (RFQ) for the 2025-2026 Sewer Manhole Rehabilitation Project seeking a qualified contractor to perform sewer manhole rehabilitation services per the RFQ terms and specifications. Contractors must be specially trained and experienced and must comply with the RFQ’s terms, conditions, and specifications. Bidders must register and submit responses via the City of Hayward’s OpenGov procurement portal.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The City of Hayward issued a solicitation (RFQ) for the 2025-2026 Sewer Manhole Rehabilitation Project seeking a qualified contractor to perform sewer manhole rehabilitation services per the RFQ terms and specifications. Contractors must be specially trained and experienced and must comply with the RFQ’s terms, conditions, and specifications. Bidders must register and submit responses via the City of Hayward’s OpenGov procurement portal.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
Posted Date
Dec 23, 2025
Due Date
Feb 6, 2026
Release: Dec 23, 2025
Close: Feb 6, 2026
Work includes sewer cured in place rehabilitation project shall include, but not be limited to, obtaining a encroachment permits from the city, providing traffic control, public notifications, cleaning of sewer lines prior to insertion of cured in place pipe resin impregnated flexible liner, cleaning of manholes prior to rehabilitation of the manhole by lining, inspection of pipelines via closed circuit television before and after liner pipe installation, bypassing manholes, bypass pumping and/or diversion of sewage flows, reconnecting service laterals and cleanup.
AvailableOutfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
Posted Date
Dec 15, 2025
Due Date
Jan 20, 2026
Release: Dec 15, 2025
Close: Jan 20, 2026
Outfall sewer rehabilitation project work includes 5 EA repair manhole channel and bench; 5 EA furnish and install cured-in-place manhole liner; 1 EA furnish and install high-build epoxy to manhole interior; see attached file.
AvailableRehabilitation of sanity sewer collection system. 859 LF - 6" to 8" pipebursting w/SDR 17 HDPE pipe, complete w/MH connections; 5821 LF - 8" to 8" pipebursting w/SDR 17 HDPE pipe, complete w/MH connections; 6680 LF - pre-installation closed circuit television & videotaping complete; 8 SY - asphalt paving repair (max 3' width).
Posted Date
Dec 5, 2025
Due Date
Jan 8, 2026
Release: Dec 5, 2025
Close: Jan 8, 2026
Rehabilitation of sanity sewer collection system. 859 LF - 6" to 8" pipebursting w/SDR 17 HDPE pipe, complete w/MH connections; 5821 LF - 8" to 8" pipebursting w/SDR 17 HDPE pipe, complete w/MH connections; 6680 LF - pre-installation closed circuit television & videotaping complete; 8 SY - asphalt paving repair (max 3' width).