Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the curbing at both locations with rebar, reinforcing and pinned to the highway and pour to match the existing curb and gutter line already in place. Backfill with dirt provided by the city, smooth and seed. Remove 3 sections of sidewalk directly in front of the building. At this point repour extending into the parking area to provide ADA accessibility. Then pour approx 171’ of new curb against existing sidewalk, with expansion material between sidewalk and new curb, and be self-supporting, and rebar reinforced. Ends should be tapered to blend into the ADA slab where it meets.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Taylor, Texas is soliciting bids for the 2025 Curb Replacement Project to replace approximately 2,500 linear feet of curb and gutter along five street segments. Work includes removal of deficient curb and gutter sections, installation of compacted flexbase, new curb and gutter, related driveway portions, and revegetation, with traffic control per MUTCD. Bids are due January 28, 2026 at 3:00 PM CST.
Posted Date
-
Due Date
Jan 28, 2026
Release: -
Close: Jan 28, 2026
The City of Taylor, Texas is soliciting bids for the 2025 Curb Replacement Project to replace approximately 2,500 linear feet of curb and gutter along five street segments. Work includes removal of deficient curb and gutter sections, installation of compacted flexbase, new curb and gutter, related driveway portions, and revegetation, with traffic control per MUTCD. Bids are due January 28, 2026 at 3:00 PM CST.
AvailableClose: Feb 3, 2026
2026 ADA - funded curb ramp replacement project.
Available2026 curb and sidewalk program project.
Posted Date
Jan 20, 2026
Due Date
Feb 11, 2026
Release: Jan 20, 2026
Close: Feb 11, 2026
2026 curb and sidewalk program project.
AvailableInvitation to bid for the 2026 Curb & ADA Ramps Project.
Posted Date
-
Due Date
Feb 18, 2026
Release: -
Close: Feb 18, 2026
Invitation to bid for the 2026 Curb & ADA Ramps Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis