CityOH
Jul 29, 2026
Closes
Aug 26, 2026
CSO 522 Gate Structure (10289010)
The City of Cincinnati is soliciting bids for construction of a new CSO 522 gate structure that will intercept an existing 24-inch concrete pipe beneath the Influent Control Structure. The work includes demolition, installation of a concrete gate structure with an electric motor-operated gate and telemetry, and compliance with contract, prevailing-wage, and contract-compliance requirements. A mandatory pre-bid meeting is required, and bids are due by 12:00 PM EDT on August 26, 2026; the estimated construction cost is $546,000.