Crystal Lake Beulah Beach Remediation and Stormwater Reduction Project

Description: Installation of a storm chamber system that will provide a total stormwater volume of 7,159 CF t with a total system area of 5,773 square feet. The system shall be equivalent to or greater than the SC310 StormTech Chamber systems details included in the plans. Work at this location includes eleven drainage structures and covers, storm sewer piping, stone riprap, trail stone removal/placement, concrete curb, hot-mix asphalt pavement, boardwalk removal/reset, excavation, backfill stone, and site restoration.