Logo

starbridge

Book a Demo
RFPs/Crystal Lake Beulah Beach Remediation and Stormwater Reduction Project

Crystal Lake Beulah Beach Remediation and Stormwater Reduction Project

Village of Beulah

Summary

Installation of a storm chamber system that will provide a total stormwater volume of 7,159 CF t with a total system area of 5,773 square feet. The system shall be equivalent to or greater than the SC310 StormTech Chamber systems details included in the plans. Work at this location includes eleven drainage structures and covers, storm sewer piping, stone riprap, trail stone removal/placement, concrete curb, hot-mix asphalt pavement, boardwalk removal/reset, excavation, backfill stone, and site restoration.

Files

Crystal Lake Beulah Beach Remediation and Stormwater Reduction Project

zip

Details

Release

Jan 07, 2025

Close

Jan 30, 2025

Contacts

Source