CityIL
Posted
Aug 26, 2026
Oct 2, 2026
Phase II Renovation Rockford Family Peace Center
Renovation center.
Description: The Indian Health Service is soliciting a construction contractor for the Crow/Northern Cheyenne Phase II operating-room renovation in Crow Agency, Montana. The work includes expanding and reconfiguring the Central Sterile Department, restoring water-damaged areas, replacing an existing air-handling unit with a rooftop HVAC unit, and completing associated architectural, mechanical, electrical, plumbing, fire-protection, and life-safety improvements. The solicitation is an active FAR Part 36, lowest-price-technically-acceptable, firm-fixed-price RFP set aside 100% for Indian Small Business Economic Enterprises, with an anticipated construction magnitude of $5,000,000 to $10,000,000.
Federal · MD, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
These related opportunities are still open for bidding.
CityIL
Posted
Aug 26, 2026
Oct 2, 2026
Renovation center.
School DistrictNC
Posted
Aug 13, 2026
Oct 23, 2026
Project includes complete renovation of the audience chamber, including removal and replacement of the existing balcony, re-raking of the existing floor, replacement of the existing theatrical and AV equipment, and significant improvements to the existing mechanical, electrical, plumbing, and fire alarm systems.
CityNY
Posted
Aug 20, 2026
Sep 24, 2026
Work consists generally of new floor, walls, ceiling, bathroom, handicap access ramp, and exterior improvements.
CityVA
Posted
Jun 8, 2026
Sep 24, 2026
The work includes the demolition of existing roadway, construction of new four lane divided roadway, concrete sidewalk, storm drain, storm water management features, signal installation, water utilities, sanitary sewer, landscaping, soundwall, and other related roadway items. 1 LS clearing and grubbing; 69,500 CY of regular excavation; 650 SY of 7" concrete entrance pavement; 970 SY of curb ramp; 5,680 SY of 4" hydraulic cement concrete sidewalk; 370 LF of wood fence; 5,587 LF of 15" RCP; 3,314 LF of 18" RCP; 2,101 LF of 24" RCP; 607 LF of 48" RCP; 20 EA manhole; erosion control; signage; pavement markings.
Decision makers connected to this RFP from Indian Health Service.