Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Austin (Austin Water Utility) issued an IFB to construct a Crosstown Tunnel Centralized Odor Control Facility to collect and treat odorous and corrosive gases from the Crosstown Tunnel as part of its Capital Improvements Program (Project No. 6943.027). The scope includes site preparation, piping/ductwork, treatment system installation, electrical work, and adherence to ROCIP safety and insurance requirements. A mandatory pre-bid conference is scheduled for 2026-01-22 and the solicitation is estimated at $5M–$15M with a response deadline of 2026-02-19.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a 38,000 cfm centralized odor control facility to mitigate odors, including biotrickling filters, fans, carbon scrubbers, site piping, ductwork, foundations, electrical, controls, and an electrical building, with provisions for future expansion to 50,000 cfm.
Posted Date
Sep 21, 2023
Due Date
Feb 19, 2026
Release: Sep 21, 2023
Close: Feb 19, 2026
Construction of a 38,000 cfm centralized odor control facility to mitigate odors, including biotrickling filters, fans, carbon scrubbers, site piping, ductwork, foundations, electrical, controls, and an electrical building, with provisions for future expansion to 50,000 cfm.
AvailableWork includes replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls and relocation of tunnel access hatches. See attached file.
Posted Date
Oct 16, 2025
Due Date
Feb 10, 2026
Release: Oct 16, 2025
Close: Feb 10, 2026
Work includes replacement of the parking lot & tunnel cap, implementation of a sump pump system, replacement of utility lines, repairing the structural integrity of the tunnel walls and relocation of tunnel access hatches. See attached file.
AvailableProvide odor control media services.
Posted Date
-
Due Date
Jan 27, 2026
Release: -
Close: Jan 27, 2026
Provide odor control media services.
AvailableSelective Demolition, Site Work: Clearing Site, Bollards 12 UN c. Odor Control Concrete Pad, d. Concrete Driveway Replacement, 6” Reinforced, e. Concrete Sidewalk Replacement, 4" Thick. Service Water Piping, Odor Control Drain Piping, Insulation and Heat Tracing, Furnish and Install Odor Control System (1500 CFM), Odor Control Ductwork, HVAC Work – Furnish/Install Wet Well Supply Fan, Electrical Work, System Startup, Site Cleanup and Restoration. Alternate "A" - Pump Station 10: Selective Demolition, Site Work" a. Clearing Site, b. 2" Water Service, c. 260 SYReplacement of Bituminous Driveway.
Posted Date
Dec 27, 2025
Due Date
Jan 22, 2026
Release: Dec 27, 2025
Close: Jan 22, 2026
Selective Demolition, Site Work: Clearing Site, Bollards 12 UN c. Odor Control Concrete Pad, d. Concrete Driveway Replacement, 6” Reinforced, e. Concrete Sidewalk Replacement, 4" Thick. Service Water Piping, Odor Control Drain Piping, Insulation and Heat Tracing, Furnish and Install Odor Control System (1500 CFM), Odor Control Ductwork, HVAC Work – Furnish/Install Wet Well Supply Fan, Electrical Work, System Startup, Site Cleanup and Restoration. Alternate "A" - Pump Station 10: Selective Demolition, Site Work" a. Clearing Site, b. 2" Water Service, c. 260 SYReplacement of Bituminous Driveway.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →