Special DistrictTX
Posted
Sep 15, 2026
Oct 14, 2026
Briscoe Canal At Mckeever Road Crossing Replacement
Work inlcudes 500 SY rmv (7"-13") trt/untrt base & asph pav; 349 CY excav (roadway); 561 CY embank (fnl)(dc)(ty b); 7 SY fl bs (cmp in plc)(ty a gr 1-2) (8"); 276 SY hydro mulch seed (perm rural sandy); 8 TN lime (com or qk)(slurry) or qk(dry); 467 SY lime trt (subgrade) (8"); 189 TN asphalt trt base (gr 2)(pg 64); 94 GAL prime coat (mc-30); 71 ton d-gr hma ty-d sac-b pg70-22; 42 GAL tack coat; 128 lf trench safety system. See attached file.