Description: Construction of a two-cell 5' x 10' cast-in-place concrete box culvert in washington county. The crossing is located on hollow road, section 29, township 40 north, range 1 west, 38. 1698 (latitude), -91. 0673 (longitude). Work will consist of constructing the box culvert and wingwalls per the plans. Approximately 90 LF of concrete pavement with toewalls is included as a bid alternate.
County · MO, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from Washington County.
Adjacent opportunities open for bidding right now.
CountyNC
Aug 27, 2026
Closes
Sep 24, 2026
Work includes approx. of 25 LF of 16" dia. X 0.25" thick steel encasement by bore and jack; 13,230 LF of 8" DR21 C900 PVC water line (no rock); 111 LF of 8" DIP water line (no rock); 330 SY of asphalt road pavement repair (DOT street); 320 LF of asphalt drive repair; 150 LF of concrete drive repair; 440 LF of gravel drive repair.
Summit Township Water Authority
Special DistrictPA
Aug 24, 2026
Closes
Sep 14, 2026
Procurement for a Water Infrastructure Replacement Project.
CityPA
Aug 24, 2026
Closes
Sep 14, 2026
Water infrastructure replacement project.
Southwest Regional Water District
Special DistrictOH
Aug 28, 2026
Closes
Sep 16, 2026
Work includes installation approx. 9,490 ft of 8" & 6" ductile iron water main and appurtenances incl. 5 connections to ex. Mains, 103 service replacements, 5 road crossings.