CityAL
Aug 20, 2026
Closes
Sep 3, 2026
Description: The project involves the removal of existing roofing materials down to bare decking and inspecting, repairing, or replacing all damaged framing, trusses, rafters, and fascia. Contractors are required to cover spaced decking with 1/2" exterior grade sheathing material, install a self-adhered roofing underlayment followed by synthetic or 15# felt underlayment, and re-roof using 30-year dimensional Class A fiberglass asphalt shingles. Additionally, the scope includes installing new boots on penetrations, re-flashing valleys and chimneys, closing unused operational vents, installing ridge vents with self-adhered starter shingles and drip rails, clearing debris with a magnetic sweep, and providing a one-year leak-free warranty along with real-time photo documentation during repairs.
City · AL, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Mobile.
Adjacent opportunities open for bidding right now.
CityAL
Aug 20, 2026
Closes
Sep 3, 2026
The project entails a complete residential roof replacement down to bare decking. The contractor must inspect and repair or replace all roof trusses/rafters, deteriorated decking, rafter tails, fascia, and exposed wood to ensure a flat, stable structure, painting exposed repairs to match existing colors. Requirements include re-flashing valleys, vents, and chimneys, installing new boot penetrations, preparing roof decking to accept a ridge vent, installing self-adhered roofing underlayment followed by synthetic or 15# asphalt impregnated felt, and installing self-adhered starter shingles with a 30-year dimensional Class A fiberglass asphalt shingle finish (or self-adhering modified roll roofing where appropriate). Additionally, contractors are required to perform photo-documentation through each step via third-party apps like Company Cam®, remove unused non-operational roof elements, and maintain a clean site with immediate debris haul-away and magnetic perimeter sweeps.
CityAL
Aug 20, 2026
Closes
Sep 3, 2026
The project involves residential rehabilitation and roof replacement for the property. The scope requires stripping existing roofing down to bare decking, repairing/replacing rotten framing or trusses, painting exposed wood to match existing color, installing self-adhered roofing underlayment topped with synthetic or 15# asphalt-impregnated felt, re-flashing all valleys and vents, installing new boots, and re-roofing with 30-year dimensional Class A fiberglass asphalt shingles (or self-adhering modified bitumen roll roofing where applicable). Real-time progress photos must be submitted through each stage of work, and all debris must be immediately hauled away with a magnetic perimeter sweep completed.
CityAL
Aug 20, 2026
Closes
Sep 3, 2026
The project involves a residential roof rehabilitation and replacement down to bare decking. Work includes checking and repairing or replacing roof trusses, rafters, rotten/deteriorated decking framing, rafter tails, and fascia, followed by protecting repaired wood and painting exposed elements to match existing colors. Contractors must re-flash all valleys, vents, openings, and chimneys, install new boots around roof penetrations, cover the entire roof decking with self-adhered roofing underlayment plus synthetic or 15# asphalt impregnated felt underlayment, install self-adhered starter shingles, prepare for ridge vents, and re-roof with 30-year dimensional class A fiberglass asphalt shingles (or self-adhering modified bitumen roll roofing where applicable). Real-time photographic proof of progress throughout each step of repair and material delivery must be provided to the inspector.
CityAL
Aug 20, 2026
Closes
Sep 3, 2026
Work includes removing existing roofing materials down to bare decking, inspecting and repairing or replacing any rotten, broken, or weak decking and framing (including rafter tails and fascia), and painting exposed wood to match the existing color. The project requires covering spaced decked areas with 1/2" exterior grade sheathing, re-flashing all valleys, vents, chimneys, and roof openings, installing new pipe boots, laying down a self-adhered roofing underlayment followed by synthetic or 15# felt, and installing self-adhered starter shingles along with 30-year dimensional Class A fiberglass asphalt shingles in the owner's choice of color.