CityIN
Jul 30, 2026
Closes
Aug 13, 2026
0577A - Vance Ave Concrete Street Rehab
This project will improve vehicle traffic by replacing deteriorated concrete pavement, milling the existing surface, and applying a watertight road fabric beneath 3.5 inches of Hot Mix Asphalt (HMA) in multiple lifts. Replacing deteriorated sidewalk, adding ADA Curb ramps, restoration and updating traffic striping.