FederalDC
Posted
Nov 12, 2026
Dec 14, 2026
MOD/MODE/US BYPASS CANAL REPAIRS
MOD/MODE/US BYPASS CANAL REPAIRS
Description: Valley Water is soliciting bids for localized shotcrete repairs at three separate locations along the Coyote-Alamitos Canal wall in and near San Jose, California. Work includes sawcutting and removing damaged shotcrete, preparing substrates, installing approximately 3,465 square feet of welded wire mesh, and placing approximately 39.63 cubic yards of 4,000-psi wet-mix shotcrete at 3 inches nominal thickness. The Contractor shall provide all labor, materials, equipment, access controls, environmental protection, cleanup, disposal, curing, documentation, and restoration necessary to complete the repairs. The canal will be dry with no canal operations during construction, and the Contractor shall install straw wattles at both ends of each work area and provide a temporary bypass if rain occurs. Access is over a 10- to 12-foot dirt maintenance road, and work may be suspended when rain makes the road or work area unsafe or impassable. The desired completion date is December 31, 2026, subject to weather and safe site conditions.
SpecialDistrict · CA, US
Adjacent opportunities open for bidding right now.
FederalDC
Posted
Nov 12, 2026
Dec 14, 2026
MOD/MODE/US BYPASS CANAL REPAIRS
Ann Arbor Public School District
School DistrictMI
Posted
Oct 27, 2026
Dec 1, 2026
Work include demolition, general trades, shotcrete repairs, stage equipment, plumbing and hvac, electrical/ theater lighting, a/v systems.
CountyLA
Posted
Oct 28, 2026
Nov 24, 2026
Provide canal maintenance project.
Cosumnes Community Services District
Special DistrictCA
Posted
Nov 20, 2026
Dec 17, 2026
The District is procuring construction services to build the new Coyote Oaks Park in Elk Grove, CA, including all labor, materials, equipment, transportation, and services required for park construction. Work includes clearing, grubbing, grading, storm drainage, irrigation and potable water utilities, planting, electrical, and installation of concrete flatwork, curbs, concrete seat walls, site furnishings, play equipment, fitness equipment, shade structure, lighting, and other appurtenances. The project has an estimated construction cost of $830,000.
Decision makers connected to this RFP from Santa Clara Valley Water District.
Solicitation files and supporting documents for this bid.